![Emerson Daniel 3818 Скачать руководство пользователя страница 56](http://html.mh-extra.com/html/emerson/daniel-3818/daniel-3818_installation-manual_103510056.webp)
Figure 3-7: CPU Module power source connections
A. Power In connector (main power)
B. 24V Loop power
C. 2 Ampere fuse (used for the main power input)
3.7
Security seal installation
Security seals protect the integrity of the meter metrology and prevent tampering with
transducer assemblies. The following sections detail how to properly seal the Daniel 3818
LNG Liquid Ultrasonic Flow Meter after commissioning. The security seal wires are
commercially available.
WARNING
CUTTING HAZARD
Sharp edges may be present on the meter.
Wear appropriate personal protective equipment when working on the meter.
Failure to comply can cause serious injury to personnel.
Be sure to set the WRITE PROT. switch on the CPU Module to the ON position prior to
sealing the enclosure.
3.7.1
Sealing the Transmitter Electronics Enclosure
Use the following instructions to install the security seal wires on the Transmitter
Electronics Enclosures.
Electrical Installation
Installation manual
May 2019
3-9000-771
56
3818 LNG Liquid Ultrasonic Meter
Содержание Daniel 3818
Страница 2: ...2 ...
Страница 10: ...Contents Installation manual May 2019 3 9000 771 x 3818 LNG Liquid Ultrasonic Meter ...
Страница 26: ...Introduction Installation manual May 2019 3 9000 771 26 3818 LNG Liquid Ultrasonic Meter ...
Страница 60: ...Electrical Installation Installation manual May 2019 3 9000 771 60 3818 LNG Liquid Ultrasonic Meter ...
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ......
Страница 86: ...Engineering Drawings Installation manual May 2019 3 9000 771 82 3818 LNG Liquid Ultrasonic Meter ...