System Installation
Centellis 2000 Shelf Release 3.0 Installation and Use (6806800L99F)
61
The following sections describes the startup procedure for Centellis 2000 AC and Centellis
2000 DC systems.
3.3.3.1
AC System Startup Procedure
Depending on the system configuration, the actual powering up may take up to 3 minutes.
Make sure that the system has been placed in a location at room temperature for at least
24 hours before powering it up.
1. Put on an ESD wrist strap.
2. Connect the strap to the shelf by attaching the front or rear ESD jack/ESD snap.
3. Mount the grounding cable to the Protective Earth connection lug if not done
already.
4. Make sure that the external power feeds you plan to attach are powered off and
cannot be switched on while you are working.
5. Connect the AC International Electric Code (IEC) wired connector to the AC power
supplies.
Product Damage
Improper cabling damages your product.
Take extreme care not to connect the power cable in reverse polarity.
Содержание Centellis 2000 Shelf Release 3.0
Страница 8: ...Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F 8 ...
Страница 10: ...Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F 10 List of Tables ...
Страница 12: ...Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F 12 List of Figures ...
Страница 20: ...Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F About this Manual 20 About this Manual ...
Страница 40: ...System Overview Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F 40 ...
Страница 52: ...Site Preparation Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F 52 ...
Страница 87: ...FRU Installation Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F 87 ...
Страница 106: ...Non Field Replaceable Units Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F 106 ...
Страница 108: ...Cooling Subsystem Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F 108 ...
Страница 116: ...Power Subsystem Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F 116 ...
Страница 146: ...Redundancy Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F 146 ...
Страница 154: ...Software Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F 154 ...
Страница 158: ...Troubleshooting Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F 158 ...
Страница 174: ...Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F Safety Notes 174 ...
Страница 188: ...Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F Sicherheitshinweise 188 ...
Страница 192: ...Index Centellis 2000 Shelf Release 3 0 Installation and Use 6806800L99F 192 ...
Страница 193: ......