Installation, Operation and Maintenance Manual
VCIOM-13254-EN Rev. 3
February 2021
24
Section 4: Set-up/Start-up Procedure
Set-up/Start-up Procedure
4.4
Handpump
4.4.1
2-Way Remote Electric without ESD solenoid function
NOTE:
Handpump Isolation Valve (8)
The components referenced below are referencing Schematic 4.4.1. and is for illustration
purposes only. When using this procedure refer to the Bettis EHO Actuator General
Arrangement Drawing and Hydraulic Schematic for the unit being worked on.
4.4.1.1
Check the Reservoir (I) to see the hydraulic is at the proper level.
4.4.1.2
Rotate downward in the horizontal position both Handpump Selector
Valves (M).
4.4.1.3
Select and push inward the open or close knob located on the Handpump
Selector Manifold (L).
4.4.1.4
Use supplied Handpump Handle to discharge hydraulic fluid into the
open or close side of the actuator cylinder.
4.4.1.5
Continue hand pumping until the actuator completes the open or close
stroke and contacts the actuators adjustable end stops.
4.4.1.6
Once completion of the hand pumping operation, push the Pump
Bypass Valve located on the top of the Handpump Selector Manifold (L)
and pull the pump handle downward retracting the pump ram into the
pump body.
4.4.1.7
Rotate both Handpump Selector Valves back into the upward
vertical position.
4.4.1.8
Check the Reservoir (I) to see the hydraulic fluid is at the proper level.