background image

 

 

NetSure 701 A41, NetSure 501 A41, NetSure 501 A91   

Subrack Power system User Manual 

 

Version 

V1.0 

Revision date 

August 29, 2012 

BOM 

31012653 

 

 

Emerson Network Power provides customers with technical support. Users may contact the nearest 

Emerson local sales office or service center. 

 

Copyright © 2012 by Emerson Network Power Co., Ltd. 

All rights reserved. The contents in this document are subject to change without notice. 

 

Emerson Network Power Co., Ltd. 

Address: No.1 Kefa Rd., Science & Industry Park, Nanshan District 518057, Shenzhen China 

Homepage: www.emersonnetworkpower.com.cn 

E-mail: [email protected] 

Содержание NetSure 501 A41-S1

Страница 1: ...rt Users may contact the nearest Emerson local sales office or service center Copyright 2012 by Emerson Network Power Co Ltd All rights reserved The contents in this document are subject to change without notice Emerson Network Power Co Ltd Address No 1 Kefa Rd Science Industry Park Nanshan District 518057 Shenzhen China Homepage www emersonnetworkpower com cn E mail support emersonnetwork com cn ...

Страница 2: ...ersonnel must be licensed to operate high voltage and AC power In operation the installation personnel are not allowed to wear conductive objects such as watches bracelets bangles rings When water or moisture is found on the Subrack turn off the power immediately In moist environment precautions must be taken to keep moisture out of the power system Prohibit warning label must be attached to the s...

Страница 3: ... that when tool connection is loosened the free movement of the human body and tool is reduced to a minimum VI Dangerous energy Warning 240VA hazardous energy keep off no bridge connection This converter contains outputs exceed 240VA when installing into end system care must be taken that the output and appropriate wire may not be touched Battery Danger Before any operation on battery read careful...

Страница 4: ...setting method Notice The advantage of enabling BLVD is protecting the batteries from over discharge when the battery voltage is low The disadvantage of enabling BLVD is that when the battery voltage drops down to a certain value all the loads including non priority loads and priority loads will be cut off due to battery disconnection The advantage of software disabling BLVD is prolonging the powe...

Страница 5: ...lation Check And Startup 16 3 2 Basic Settings 16 3 3 Alarm Check And System Operation Status Check 17 3 4 Final Steps 18 Chapter 4 Use Of Monitoring Module M221S M221S 19 4 1 Control Keypad And Indicator 19 4 1 1 Front Panel 19 4 1 2 Indicator Function 19 4 1 3 Control Keypad Function 19 4 2 LCD Menu Tree 20 4 2 1 Status 20 4 2 2 Settings 21 4 2 3 Manual 28 4 2 4 ECO 28 4 2 5 Quick Setting 28 4 2...

Страница 6: ...ter Settings 60 5 7 10 Controller Parameter Settings 60 5 8 Energy Saving Setting 60 5 9 Quick Settings 61 5 10 Access M820B Through Web 61 5 10 1 Login 62 5 10 2 Homepage Introduction 63 5 10 3 Device Information 64 5 10 4 Data Browse Control And Parameter Setting Of Rectifier 64 5 10 5 Data Browse Control And Parameter Setting Of Battery 67 5 10 6 Alarms 69 5 10 7 Maintenance 70 5 10 8 Configura...

Страница 7: ...nstruction Of Battery Rack 95 1 Installation Instruction Of Two Layer And Four Layer Battery Rack 95 2 Installation Instruction Of Three Layer Battery Rack 97 3 Fixing The Battery Rack 98 Appendix 3 Wiring Diagram 99 Appendix 4 Shematic Diagram 107 Appendix 5 Glossary 115 ...

Страница 8: ......

Страница 9: ... of the power supply system 1 Version The number of the rectifier in the typical power supply system 4 If the number ranges between 0 9 the character is represented by a number If the number is larger than 9 the character isrepresented by a letter for example A represents the number 10 B represents the number 11 and so on S 1 Cabinet type Subrack Cabinet configuration Figure 1 1Model information 1...

Страница 10: ...module Battery MCB Positive terminals Controller AC input MCB Figure 1 3 NetSure 501 A91 S1 system structure Figure 1 4 NetSure 701 A41 S2 S4 system structure Figure 1 5 NetSure 701 A41 S1 S3 S5 system structure Figure 1 6 NetSure 701 A41 S5 system structure System configuration The configurations of the power system are described in Table 1 1 ...

Страница 11: ...r distribution BLVD load route 2 16A 1P MCB LLVD load route 2 63A 1P 2 32A 1P MCB BLVD load route 2 10A 1P 2 32A 1PMCB LLVD load route 2 63A 1P 2 32A 1P MCB BLVD load route 5 63A 1P 5 32A 1P 8 10A 1P MCB LLVD load route Not configured BLVD load route 1 10A 1P MCB LLVD load route 4 40A 1P MCB BLVD load route 4 63A 1P 6 32A 1P 2 10A 1P MCB LLVD load route Not configured BLVD load route 2 32A 1P 2 16...

Страница 12: ...ck out at the first over voltage and lock out at the second over voltage Perfect battery management The management functions include the LLVD optional BLVD temperature compensation auto voltage regulation stepless current limiting battery capacity calculation and on line battery test etc M221S and M222S support historical alarm record up to 200 and historical record up to 1000 And M820B supports h...

Страница 13: ...er and Emerson Network Power Co Ltd To inspect the equipment you should open the packing case take out the packing list and check against the packing list that the equipment is correct and complete Make sure that the equipment is delivered intact Cables The cable design should meet relevant industry standards It is recommended to use the RVVZ cables as AC cables The cable should reach at least 70 ...

Страница 14: ... H type terminal max cable CSA 35mm2 Single phase power input H type terminal max cable CSA 25mm2 Three phase power input AC power line Grounding busbar One M8 bolt OT type wiring terminal max cable CSA 35mm2 Connected to the grounding bar of the equipment room DC power distribution Battery output MCB H type terminal max cable CSA 25mm2 63A and below H type terminal max cable CSA 50mm2 capacity ab...

Страница 15: ...power system Battery bracket M6 screw Connector Figure 2 1 Cabinet and rack installation Installed in cabient Insert the subrack power system to the matching cabinet as shown in Figure 2 2 电源插框 Subrack power system Figure 2 2 Installed in the cabinet system The engineering graphics of the subrack power system as shown in Figure 2 3 to Figure 2 8 ...

Страница 16: ... 501 A91 Subrack Power system User Manual Figure 2 3 Installation size of NetSure 501 A41 unit mm 445 Figure 2 4 Installation size of NetSure 501 A91 unit mm Figure 2 5 Installation size of NetSure 701 A41 S1 unit mm Figure 2 6 Installation size of NetSure 701 A41 S2 S3 unit mm ...

Страница 17: ...s head screwdriver when there is no operation 2 Also tighten the handle of the 501 modules by the cross head screwdriver 3 Please plug in the new modules or installing a new panel after removing the rectifier module 2 4 Electrical Installation 2 4 1 Power System Cabling Method Cabling from the top of the power system DU unit and MFU unit are available for the system top cover cabling For DU unit c...

Страница 18: ...side of the power system Use a cross head screwdriver to remove two screws which fix the cabling panel at side of cabling area then the cable can be led out from the cabling area as shown in Figure 2 11 出线板 出线空间 螺钉 Figure 2 11 Side cable cabling Illustration 2 4 2 Connecting AC Input Cables Danger 1 Switch off all MCBs before the electrical connection 2 Only the qualified personnel can do the main...

Страница 19: ...current Before connecting the battery cables the corresponding battery input MCBs or the battery cell connector must be disconnected to avoid live state of the power system after installation 2 Be careful not to reverse connect the battery Otherwise both the battery and the power system will be damaged 1 Connect one end of the negative battery cable to the upper terminal of battery MCBs Connect on...

Страница 20: ...re 501 A41 power supply system as an example the position of the user connector board W2453X1 is shown in Figure 2 15 Figure 2 15 W2453X1 user interface board Illustration At most two user connector boards are allowed in the power supply system Standard cabinet is only configured with one user connector board With one user connector board configured the power supply system provides three external ...