OPEN AMPEROMETRIC CELLS
OPERA
TING MANU
AL
EN
ECL6 - ECL6E - ECL12 - ECL12E
Страница 1: ...OPEN AMPEROMETRIC CELLS OPERATING MANUAL EN ECL6 ECL6E ECL12 ECL12E...
Страница 2: ...ECL12 10 ECL12 E 10 Operating principle 11 Precautions 11 Installation 12 pH ORP temperature probes installation 13 Commissioning 13 Electrode replacing 14 Electrode cleaning 14 Calibration 15 Decommi...
Страница 3: ...o umano Equipment intended to come into contact with food Materiales y objetos plasticos destinados a entrar en contacto con alimentos Danger Indicates a hazardous situation which if not avoided will...
Страница 4: ...ations concerning the transport and storage of aggressive fluids When installing always observe national regulations Manufacturer is not liable for any unauthorized use or misuse of this product that...
Страница 5: ...m to the nearest representative Waste and emissions regulations Observe these safety regulations regarding waste and emissions Dispose appropriately of all waste Handle and dispose of the dosed chemic...
Страница 6: ...and the action of chemicals Before returning the probe to the manufacturer repair service refer to Decommissioning DO NOT DISCARD PACKAGING USE IT TO RETURN THE PROBE To store the probe refer to Deco...
Страница 7: ...constant and within 40 l h A pressure stabilizer is available for areas subject to sudden pressure changes It is recommended to instal a filter before the probe holder Suitable for non clean water th...
Страница 8: ...ic for salt water pH and ORP probe holder ECL12 E for free chlorine organic and inorganic for salt water Packaging Packaging includes AMPEROMETRIC CELL COD 11070081 KIT SCREW WASHER SCREW COVERS COD 1...
Страница 9: ...ent See Operating manual Calibration Alcalinity 100 ppm Working temperature 5 40 C 41 104 F Pressure 0 4 5 bar 5 8 72 5 PSI Cable standard 2 m 6 6 ft 1 m if assembled on panel Working flow 40 l h Suit...
Страница 10: ...Slope calibration See Operating manual Calibration DPD1 method Alcalinity 100 ppm Working temperature 5 40 C 41 104 F Pressure 0 4 5 bar 5 8 72 5 PSI Cable standard 2 m 6 6 ft 1 m if assembled on pane...
Страница 11: ...T FOLLOW these PRECAUTIONS Operating principle Precautions WEAR UNPOWDERED NITRILE GLOVES Avoid contact of the electrolyte with the skin In case of contact with skin rinse immediately with plenty of w...
Страница 12: ...end the installation of a filter before the amperometric cell 4 Install pH ORP and temperature probes if any in their seats 5 Connect SEPR and electrode to the instrument terminal board refer to the m...
Страница 13: ...lve 2 Turn until the float reaches the black mark on the cell 3 SEPR LED lights to indicate the proper flow into the cell Fig 4 Correct float position Commissioning 1 1 2 2 3 3 4 4 5 5 6 6 A B C D Pro...
Страница 14: ...approximately 30 degrees so as not to fall outside the cleaning balls 6 Unscrew the electrode and replace it with a new one or clean as specified in paragraph Electrode cleaning 7 Screw electrode in...
Страница 15: ...D AND QUALIFIED PERSONNEL only in accordance with local regulations DANGER POWER SUPPLY DISCONNECTION Always disconnect power to the equipment before you perform any installation or maintenance tasks...
Страница 16: ...PLY DISCONNECTION Always disconnect power to the equipment before you perform any installation or maintenance tasks Failure to disconnect power will result in serious physical injury DANGER AUTHORIZED...
Страница 17: ...essure Check installation Nessun segnale di lettura Insufficient flow into the cell Check correct position of the float If necessary open water flow into the cell Desoldering wires in the electrode ca...
Страница 18: ...AMPEROMETR Massimo_F Massimo_F 21 60 00 201 70 223 20 9 00 106 00 9 00 100 00 ECL6 1 2 3 A B C Progettato da Controllato da Data Edizione Foglio 1 1 ECL6 CELLA AMPEROMETRICA ECL6 Massimo_F Massimo_F...
Страница 19: ...Massimo_F Massimo_F 21 07 201 9 00 81 00 177 30 60 00 171 70 9 00 100 00 ECL6 E 1 2 3 A B C Progettato da Controllato da Data Edizione Foglio 1 1 ECL6E CELLA AMPEROMETRICA ECL6E Massimo_F Massimo_F 2...
Страница 20: ...PEROMETRICA Massimo_F Massimo_F 22 07 2015 60 00 201 70 223 20 9 00 106 00 9 00 100 00 ECL12 1 2 3 A B C Progettato da Controllato da Data Edizione Foglio 1 1 ECL12 CELLA AMPEROMETRICA ECL12 Massimo_F...
Страница 21: ...RIC Massimo_F Massimo_F 22 07 20 9 00 81 00 177 30 60 00 171 70 9 00 100 00 1 2 3 A B C Progettato da Controllato da Data Edizione Foglio 1 1 ECL12E CELLA AMPEROMETRICA ECL12E Massimo_F Massimo_F 22 0...
Страница 22: ...ICAL Connections connector cables Other NOT OR INADEQUATE FUNCTION OTHER MOD 7 5 B1 Q Ed 1 rev 0 21 02 2012 OPERATING CONDITIONS Location installation description Chemical Start up date Running time a...
Страница 23: ...23...
Страница 24: ...on center for the recycling of electronic and electrical equipment For more information visit the online site When dismantling a pump please separate material types and send them according to local re...