8
OPERATION DESCRIPTION
3.1
INSTALLMENT
1) Apart all the wooden package. Avoid damaging the machine.
2) Move the machine to an installment position by fork lift.
3) Install master cover and tighten screws on both side.
4) Lift up the tower.
5) Fix and tighten the tower by M8 screws. Total 6 screws on each side.
6) Connect the sensor wires.
Proximity Switch: “
―”&
4.
7) Install the motor cover and support brackets.
Total 4 screws required.
Connect the power cable with the socket by a 110V/230V power.
Содержание EXP-103
Страница 1: ...1 PALLET STRETCH WRAPPING MACHINE MODEL EXP 103 OPERATION MANUAL ...
Страница 6: ...6 2 2 MACHINE DIMENSION ...
Страница 7: ...7 2 3 MACHINE DESCRIPTION TURNTABLE SEAT CARRIAGE TOWER CONTROL BOX MOTOR COVER ...
Страница 10: ...10 3 3 OPERATION OF CONTROL PANEL ...
Страница 15: ...15 4 2 ELECTRICAL DIAGRAM Sensor limit switch location ...
Страница 17: ...17 ...
Страница 18: ...18 ...
Страница 19: ...19 ...
Страница 20: ...20 ...
Страница 21: ...21 ...
Страница 23: ...23 ...
Страница 24: ...24 ...
Страница 25: ...25 ...
Страница 26: ...26 ...
Страница 27: ...27 ...
Страница 28: ...28 ...
Страница 31: ...31 6 PART LIST 6 1 SEAT ...