For information about:
Go to
How to install and use the DD Boost software
and plug-in
EMC Data Domain Boost for OpenStorage
Administration Guide
for your software release
How to replace Data Domain hardware
components
Specific part installation guides
How to use third-party applications
Integration documentation and compatibility
matrices
Tools and supplies needed
For a list of recommended tools and supplies for field work, see the document titled
FE
Toolkit Inventory and Common Procedures for FRU Tasks
Safety information
CAUTION
l
If the system is used in a manner not specified by the manufacturer, the protection
provided by the equipment may be impaired.
l
The RJ-45 sockets on the motherboard, PCI cards, or I/O modules are for Ethernet
connection only and must not be connected to a telecommunications network.
Review this list of important safety recommendations.
l
All plug-in modules and blank plates are part of the fire enclosure and must be
removed only when a replacement can be added immediately. The system must not
be run without all parts in place.
l
A controller must be operated only from a power supply input voltage range of 100–
240 VAC, 50–60 Hz.
l
Each component is intended to operate with all working power supplies installed.
l
Provide a suitable power source with electrical overload protection.
l
A safe electrical earth connection must be provided to each power cord. Check the
grounding of the power sources before applying power.
l
The plug on each power supply cord is used as the main disconnect device. Ensure
that the socket outlets are located near the equipment and are easily accessible.
l
Permanently unplug the unit if you think it is damaged in any way and before moving
it. If the unit is powered by multiple sources, disconnect all supplied power for
complete isolation.
l
The power connections must always be disconnected prior to removal or replacement
of a power supply module from any of the components in the system.
l
A faulty or failed fan module should be replaced as soon as possible. A faulty or
failed power supply module must be replaced within 24 hours.
l
EMC Data Domain systems are heavy. Use two people or a mechanical lift to move
any system.
l
To comply with applicable safety, emission, and thermal requirements, covers must
not be removed and all bays must be fitted with plug-in modules.
EMC Data Domain DD2500 System Installation and Setup Guide
Tools and supplies needed
3