background image

EMC

®

 Celerra

®

 NS-120 System

 

(Single Blade)

Installation Guide

P/N 300-007-880 Rev A04

Содержание CelerraNS-120

Страница 1: ...EMC Celerra NS 120 System Single Blade Installation Guide P N 300 007 880 Rev A04...

Страница 2: ...ANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE Use copy or distribution of any EMC software described in this publication requires an applicable software license For the most up to date...

Страница 3: ...requirements Rack space requirements Default IP addresses The system components communicate with each other using a private Internet Protocol IP network By default this network uses the IP addresses l...

Страница 4: ...sly lim ite d to the term s an d co nd itio ns of the Lic en se Ag reem en t EMC Celerra NS20 Back Next Cancel EMC Celerra NS20 System Tutorial CSA Installation P N nnn nnn nnn A0n EMC Tutoria l CSA...

Страница 5: ...0 use the Celerra Startup Assistant CSA to pre configure your system The latest version of the CSA can be downloaded from the Celerra Tools section on Powerlink The CSA is also on the Celerra Applicat...

Страница 6: ...binet 70 in where 1 unit 1 75 in start on page 15 of this document and confirm that the cables are installed correctly and securely otherwise start unpacking your Celerra NS 120 system from the dispos...

Страница 7: ...te it on the back of the front cover of this installation guide Ganged rails Contents of package Disposable mini rack Accessory box Document inventory list Disk array enclosure Standby power supply in...

Страница 8: ...me 1 Using a Phillips head screwdriver remove only 7 screws per side Keep the removed screws to install the components in the rack Front Mini rack 2 Control Station CS 4 Storage processor enclosure SP...

Страница 9: ...rails in place in the disposable mini rack Keep the screws to install the ganged rails in your rack Rail slide with extensions Remove 2 screws each side Disposable mini rack Remove the ganged rails f...

Страница 10: ...the components Install rails into site rack from the front For more information refer to Celerra Tools on http Powerlink EMC com 1 7 13 16 17 18 19 21 22 23 3 10 Install the retaining screw in hole 2...

Страница 11: ...com 2 screws per side Front A and B sides bezel bracket Disk array enclosure DAE 2 bracket screws each side Install the bottom component first Ensure that each component is secure before you install t...

Страница 12: ...0 NS 120 configuration with additional iSCSI modules B0 B1 B2 B3 B4 MGMT A A0 A1 A2 A3 A4 CNS 001462MOD B0 B1 B2 B3 B4 MGMT A A0 A1 A2 A3 A4 10 100 1000 0 0 NS 120 Base configuration MGMT B B0 B1 B2 B...

Страница 13: ...FRU label 10 100 2 3 FRU label 10 100 2 3 4 copper Ethernet ports Blade enclosure 046 003 710_A01 FRU label 10 100 046 003 710_A01 FRU label 10 100 2 10 GbE optical and 2 copper ports fxg 0 fxg 1 Bla...

Страница 14: ...2 3 EXP PRI EX 4Gb EXP PRI 4 5 6 7 0 1 2 3 4 5 6 7 0 1 2 3 EXP PRI EX 4Gb EXP PRI LCC A 0 MGMT B B0 B1 B2 B3 B4 MGMT A A0 A1 A2 A3 A4 CNS 001469 10 100 1000 10 100 1000 0 0 0 LCC B Storage processor...

Страница 15: ...E1 1 2 SPA A0 Port2 Blade 2 BE 0 2 Fibre 1 2 Storage processor enclosure SPE SPA A0 Port2 Blade 2 BE 0 1 2 3 0 S P B B 0 P o r t 2 Blade 2 BE 1 2 2 3 3 Blade 2 BE 1 SPB B0 Port2 NS 120 Base configurat...

Страница 16: ...Powerlink EMC com 1 2 3 0 1 2 3 0 1 2 3 0 1 0 Standby power supply SPS Modem Control Station CS Storage processor enclosure SPE SPS A 1 2 3 0 Blade 3 Blade 2 SP B SP A CNS 001470 SPS A Blade enclosur...

Страница 17: ...SPS Storage processor enclosure SPE Blade enclosure Blade 2 CNS 001466 3 Blade 2 SPB MGMT B A CS CS B Blade 2 SPA MGMT A CS B SPA MGMT A SPB MGMT B Blade 2 Blade 2 A C S For more information refer to...

Страница 18: ...stomer supplied 1 To public LAN MGMT To public LAN 1 Storage processor enclosure SPE Blade enclosure Control Station CS Standby power supply SPS cge0 cge1 cge2 cge3 MGMT Note The blade in your Celerra...

Страница 19: ...ector Latch side up LCC B PRI A connector Latch side down LCC A A B LCC B PRI 1 2 Blade enclosure Pull release tab Pull release tab 0 1 2 3 0 LCC B LCC A Disk array enclosure DAE Storage processor enc...

Страница 20: ...Connect power cable from the first disk array enclosure DAE power A to SPS A 2 Connect power cable from the first DAE power B to the left power distribution panel PDP 3 Connect storage processor SP po...

Страница 21: ...0 CS Blade enclosure SPS A SP A CNS 001467 Power distribution panel PDP SP B 1 2 3 0 A B Blade 2 Disk array enclosure DAE 1 0 1 2 3 0 1 0 PDP SPS A switch 1 7 8 5 6 3 4 2 Blade 3 Cabling the EMC Cele...

Страница 22: ...e switches for SPS A and SPS B are turned OFF Connect the power cables as follows A yellow circle with a number indicates the power cable number 1 Connect power cable from the disk array enclosure DAE...

Страница 23: ...k array enclosure 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 PDP 1 5 3 4 2 CS SPS A Blade 3 Blade 2 SP B SP A 6 7 8 9 Cabling the EMC Celerra NS 120 system Note The blade in your Celerra system may have four Eth...

Страница 24: ...ed CNS 001458 Blinks amber when booting Off when working Green when booted Blade enclosure Blinks green when booting Link Activity A1 A2 A3 A4 B1 B2 B3 B4 MGMT A0 MGMT B0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3...

Страница 25: ...h you have the option of configuring Multi Path File System MPFS on your Celerra This configuration supports connecting directly to the MPFS clients or connecting to the MPFS clients through a switch...

Страница 26: ...l ports available for host attach you have the option of configuring Multi Path File System MPFS on your Celerra This configuration supports connecting directly to the MPFS clients or connecting to th...

Страница 27: ...iSCSI Note If your Celerra does not use MPFS proceed to page 28 If you have iSCSI ports available for host attach you have the option of configuring Multi Path File System MPFS over iSCSI on your Cel...

Страница 28: ...CS B SP B SP A SPS B SPS A CS 1 2 3 0 MGMT A0 MGMT B0 MGMT Blade 2 Blade 2 CONTROL STATION SPA A0 Port2 A B DAE LCC B LCC A LCC A LCC B PRI SPB B0 Port0 CONTROL STATION SPB B0 Port2 SPA MGMT A SPA A0...

Страница 29: ...S B SP B SP A SPS B SPS A CS 1 2 3 0 MGMT A0 MGMT B0 MGMT Blade 2 Blade 2 CONTROL STATION SPA A0 Port2 A B DAE LCC B LCC A LCC A LCC B PRI SPB B0 Port0 CONTROL STATION SPB B0 Port2 SPA A0 Port0 LCC A...

Страница 30: ...30 EMC Celerra NS 120 system notes...

Страница 31: ...is properly prepared for your Celerra System Complete the worksheet and use the information to verify the values when you run the Celerra Startup Assistant CSA For more information refer to Celerra To...

Страница 32: ...P address Storage processor B IP address Note Public IP addresses for your storage processors are required to use the Navisphere Service Taskbar on both Fibre Channel FC and non FC enabled models for...

Страница 33: ...CSA Before installing the CSA verify the following requirements Access to the Powerlink website preferred or the Celerra Network Server Applications and Tools CD is available Windows based client comp...

Страница 34: ...pre configuration is complete you must configure the system for production You can use the Provisioning Wizard in the CSA one of several pre packaged implementation configurations based on common usa...

Страница 35: ......

Страница 36: ......