
Install Rails and Components in Rack
Setting Up the EMC
®
Celerra
®
NS40 System
Before You Begin
1
1
2a Install Blade Enclosure
300-004-901 Rev A01
Copyright © 2007 EMC Corporation. All rights reserved.
2c Install Control Station
2b Install Storage Processor Enclosure
LAN1
LAN2
Front
CIP-000935
Disk-array enclosure
Standby power supply
Control Station
Storage processor
enclosure
Blade enclosure
Shipping Rack
Before you begin:
• The NS40 system you are about to install comes factory pre-loaded with Celerra Network Server software (DART) and
Storage Array software (FLARE).
DO NOT PERFORM A FRESH INSTALL OF SOFTWARE
. If a software upgrade (not fresh install)
is required, perform it after installation. For more information refer to Solution Case emc163262.
• Go to the Celerra Tools page for the latest information on the NS40 product: (http://Powerlink.EMC.com and select
Celerra Tools
in the
Navigator
).
•
Two people are required to lift several hardware components.
When installing the disk-array enclosures in the cabinet, do not remove the disks.
• Remove
only
the 16 visible Phillips-head screws on the front of the mini-rack. Do not remove any of the other screws or you may
injure yourself or damage the equipment.
Alignment
pin
Rear
Front
Adjustable rail
Alignment
pin
Right rear
Mounting rail
Screw (2)
Alignment
pin
CIP-000921
Right front
Screw
Mounting
rail
Rear
Front
Enclosure
CIP-000922
Rear
Front
Enclosure
CIP-000923
Rail
catch
Screw
(2 per side)
Bezel
Indentation
to center of
the rack
2
4
1. Select 7U (12.25 in.) of available rack space for the NS40, plus 3U (5.25 in.) for each optional disk-array enclosure
(1U =1.75 inches).
NOTE
: Use the supplied clip nuts if required for your rack.
2.
Starting at the bottom of the selected rack space,
mount one set of 1U rails for the blade enclosure as follows:
a. From the cabinet front, insert the rail alignment pin into the middle hole of the 1U space on the right side at the the
rear of the cabinet. Orient the rails so the sliding insert faces the inside of the rack.
b. Extend the rail to the front of cabinet, aligning the rail holes with the channel holes (the verticle metal bar with
evenly spaced holes) on the inside of the cabinet.
Always
ensure the rail is level
.
c. Install
but do not tighten
one of the provided screws in the top hole on the front of the rail through the cabinet channel.
d. From the cabinet rear, insert
but do not tighten
two screws in the top and bottom holes on the rail back through the
cabinet channel.
e. Repeat steps b-e to install the left rail.
3.
Two people are required for this installation:
From the cabinet front, align the blade enclosure with the mounting channels.
With the help
of another person
, slowly slide the blade enclosure into the rails until the front assembly flanges are flush with the cabinet channels.
4.
Do not insert any new screws
, but tighten the screws on each end securing the mounting rails to the cabinet channels.
5. Insert two of the provided screws into the middle and bottom holes of each rail catch. Attach the bezel rail catches to the holes
in the rail flanges on the front of the cabinet. Then press the bezel onto the rail catches until it snaps into place.
1. In the 1U space above the blade enclosure, install the storage processor
enclosure as described in
Step 2a Install Blade Enclosure.
NOTE: Do not remove the Control Station label at this time.
1. In the 1U space above the storage processor enclosure,
install the Control Station as described in
Step 2a Install Blade Enclosure
.
2
3
Required parts:
• Blade enclosure number for the NS40 single blade P/N 100-520-326 or 100-520-328
or dual blade P/N 100-520-327 or 100-520-329
• Adjustable rail kit P/N 100-561-802
• Bezel
Required parts:
• Storage processor enclosure for the NS40 P/N 100-520-372
• Rail kit P/N 100-561-802
Required parts:
• Control Station P/N 100-520-606
• Rail kit P/N 100-520-527
• Adjustable Rail Installation kit
B
A
Blade 3 (B 3)
Blade enclosure
SP A
B 2
CIP-000914
SP B
Storage processor
enclosure
B
A
Blade 3 (B 3)
Blade enclosure
SP A
B 2
CIP-000915
SP B
Control Station
Storage processor
enclosure
Required tools:
• Flathead screwdriver
• Manual Phillips-head screwdriver
Avoid stripping the screw-heads.