background image

6

13. Carefully pull back the cylinder ass'y into 

 

position

14. Ensure the cylinder ass'y is back as far as it will 

go, so that the collar of the cylinder is tight up 

against the cylinder mount as shown. 

15.  Locate  the  cylinder  saddle,  fastened  to  the 

wheel hub, remove the lug nut, carefully remove 

the saddle from the hub, 

keep the lug nut.

Содержание WALLENSTEIN WE230

Страница 1: ...ON MANUAL EMB MANUFACTURING INC 4144 BOOMER LINE ST CLEMENTS ON N0B 2M0 CANADA PH 519 699 9283 FAX 519 699 4146 PRINTED IN CANADA Rev 191011 PART NUMBER Z97502 Please review and understand the operators manual before attempting to operate this machinery ...

Страница 2: ...chine during as sembly Contact with power lines can cause electrocution Contact with obstructions can damage components or cause them to fail 9 Tighten all fasteners to their specified torque before using the machine ENGLISH TORQUE SPECIFICATIONS SAE 2 N m lb ft Bolt Torque Bolt Diameter A SAE 5 N m lb ft SAE 8 N m lb ft 1 4 5 16 3 8 7 16 1 2 9 16 5 8 3 4 7 8 1 8 13 27 41 61 95 128 225 230 345 6 1...

Страница 3: ...e job When the machine is shipped follow this assembly procedure 1 Clear the area of bystanders especially small children 2 Be sure you have all the required tools before you start 3 Move the shipping package into an area where it is accessible from all sides 4 Remove the 4 screws holding the lid to the ship ping pallet 2 on each end 5 Remove the lid and set to one side 6 Remove the screw securing...

Страница 4: ...itter beam Carefully move the tires from the skid to a safe place Shipping Brackets splitter beam 8 Open manual tube located on the axle ass y and remove the bag of hardware 9 Carefully rotate the splitter beam ass y to 90 at the tongue channel ass y so that the beam rests on top of the pivot assembly and the tongue channel ...

Страница 5: ...ng the 3 8 x 4 1 2 bolt through the bolt hole as shown 11 Assemble 3 8 hex locknut and tighten as speci fied on the torque chart pg 2 12 Once the splitter beam ass y is fastened to the pivot remove the two shipping brackets from the splitter beam ass y as shown ...

Страница 6: ...re the cylinder ass y is back as far as it will go so that the collar of the cylinder is tight up against the cylinder mount as shown 15 Locate the cylinder saddle fastened to the wheel hub remove the lug nut carefully remove the saddle from the hub keep the lug nut ...

Страница 7: ...e 1 2 hex locknut on each bolt and tighten as specified on the torque chart pg 2 17 Insert the 1 2 x 3 bolt one on each side through the gland clamp and through the saddle and cylinder mount assemble 1 2 hex locknut on each bolt and tighten as specified on the torque chart Pg 2 Gland Clamp 18 Remove the pivot lock bolt to allow the latch handle to lock into place ...

Страница 8: ...Remove the screws securing the tongue chan nel shipping bracket to the skid but do not remove the shipping bracket from the tongue channel 21 The tongue ass y is attached to the axle ass y by one bolt carefully pivot the tongue ass y on the bolt clockwise so that the flanges on both ass y s line up ...

Страница 9: ...3 8 x 1 1 4 carriage bolts through the 3 remaining holes on the flanges assemble 3 8 hex locknut on each bolt and tighten all 4 nuts as specified on the torque chart Pg 2 24 Assemble any loose hose into hose clamps al ready attached to the unit Do not overtighten the clamps or hose damage will result line up flanges shipping bracket ...

Страница 10: ...e 3 8 hex locknut on each bolt and tighten hex nuts as specified on the torque chart pg 2 26 Align the support leg with the lower holes in the hitch beam and install the snapper pin and latch it to secure the support leg in the lowered position Allow the splitter to rest on the support leg 27 When the support leg is secured then carefully remove the tongue channel shipping bracket remove 2 nuts an...

Страница 11: ...racketstotheskid andunbolt the brackets form the axle ass y 29 Carefully tilt the splitter high enough to install the tire assemble 1 2 lug nut on each lug and tighten the lug nuts as specified on the torque chart pg 2 30 Repeat for the step 28 and 29 for the left side ...

Страница 12: ...e handle will come free 32 Fit the slotted end of the handle into the lower pivot position the handle so that the hole in the handle lines up with the pivot hole Carefully insert the pivot pin 33 Using needle nose pliers secure the pivot pin by re inserting the cotter pin Test the function of the handle to ensure everything is assembled properly Congratulations on successfully completing assembly ...

Отзывы: