Installation
17
4.3 Mains power connections
NOTICE
Installation of the machine
–
It must be possible to disconnet the machine from the mains at any time.
•
Install the machine such that the connection for the mains cable is
easily accessible.
WARNUNG
W3.0023
High temperature / Burning of the skin
Hot combustion tube
•
When the analyzer (HTF, resistance furnace) is switched on again after
switching off, the adjusted set point is driven immediately. Please
check this!
Since the infrared cell requires about 1 hour to reach a stable operation temperature, it is
advisable to connect the analyzer to the mains power first immediately switch it on before
further installation work is carried out.
This waiting time is only necessary when switching on the analyzer from cold condition. It is
then normally not switched completely off, in order to always be at constant operation
temperature. During long work breaks, the analyzer is on stand-by, which is on position 1 of the
mains power switch.
Fig. 5: Mains power connection - rear view
5
4
3
8
7
9
6
1
2
Содержание CS-2000
Страница 2: ...2 Copyright Copyright by Eltra GmbH Retsch Allee 1 5 42781 Haan Germany ...
Страница 5: ...5 ...
Страница 63: ...Maintenance 63 Fig 35 Induction furnace Cone ...
Страница 80: ...Function description 80 Fig 51 Gas flow system ...
Страница 91: ...Miscellaneous 91 8 1 6 Furnace Fig 60 Furnace 71031 71010 ...
Страница 98: ...Miscellaneous 98 8 1 12 Tic module Fig 66 TIC module 35543 9008 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ...
Страница 110: ...Copyright Copyright by Eltra GmbH Retsch Allee 1 5 42781 Haan Germany ...