___________________________________________________________________________
_______________________________________________________________________________
LTP-8X optical line terminal
21
9.
Make sure the device is off, when installing or removing the case.
10.
Power supply modules should be changed only when the device if off. Follow the replacement
procedure given in Section 5.2.
11.
Follow the instructions given in Chapter 32 to install or remove SFP transceivers. This
operation does not require the terminal to be turned off.
7.2
Terminal Installation Procedure
Check the terminal for visible mechanical damage before installing and turning the terminal on. In case
of any damage, stop the installation, fill in a corresponding document and contact your supplier. If the
terminal was exposed to low temperatures for a long time before installation, leave it for 2 hours at
ambient temperature prior to operation. If the terminal was exposed to high humidity for a long time,
leave it for at least 12 hours in normal conditions prior to turning it on.
Support Brackets Mounting
The delivery package includes support brackets for rack installation and mounting screws to fix the
terminal case on the brackets. To install the support brackets:
Step 1.
Align four mounting holes in the support bracket with the corresponding holes in the side panel
of the device.
Step 2.
Use a screwdriver to screw the support bracket to the case.
Step 3.
Repeat steps 1 and 2 for the second support bracket.
Fig. 7.1. Support Brackets Mounting
Terminal Rack Installation
To install the terminal to the rack: