background image

 

 

ES 

 

 

Por favor, lea estas instrucciones atentamente antes de instalar o utilizar el equipo por primera vez. 

Please read these instructions carefully before installing or using this appliance for the first time. 

 

INSTRUCCIONES DE INSTALACIÓN Y USO 

INSTALLATION INSTRUCTIONS AND USER GUIDE 

 

GESTOR DE EXCEDENTES FOTOVOLTAICOS 

ACUMULADORES ELNUR GABARRON 

 

ENERGY SOLAR MANAGER FOR 

STORAGE HEATERS ELNUR GABARRON 

 

 

SOLAR BOX 

 

 

Содержание SOLAR BOX USB

Страница 1: ...ase read these instructions carefully before installing or using this appliance for the first time INSTRUCCIONES DE INSTALACI N Y USO INSTALLATION INSTRUCTIONS AND USER GUIDE GESTOR DE EXCEDENTES FOTO...

Страница 2: ...2 1 Instalaci n Medidores de potencia G Control PM Instale los 2 medidores de potencia AC suministrados seg n el esquema mostrado Medidor de consumo El primer medidor registrando el consumo total de...

Страница 3: ...r fico anterior independientemente del origen de la energ a consumida Fotovoltaica o red No debe ser instalado en el mismo punto que el medidor de la compa a 2 Medidor de Generaci n El cable de fase d...

Страница 4: ...e la web https remotesolar elnur es o desde la aplicaci n Elnur Solar Control disponible en App Store y Play Store Introduzca una direcci n de correo electr nico v lida que deber verificar y una contr...

Страница 5: ...G Control Hub debe estar previamente conectada con el c digo de luces correcto y el dispositivo m vil desde el que est realizando la configuraci n debe estar conectado a la red Wifi generada por el mi...

Страница 6: ...na vez registrada la vivienda puede modificar la tarifa si sta no coincide con ninguna de las preconfiguradas La instalaci n de la centralita G Control Hub EU ha finalizado 3 3 Vinculaci n de medidore...

Страница 7: ...se le pedir asignar un nombre al medidor G Control PM instalado y seleccionar el tipo de circuito Generaci n o Consumo Estos ajustes pueden ser modificados posteriormente en la secci n Configurar de...

Страница 8: ...PM installation Install the 2 G Control PM meters following the below wiring diagram Home Consumption power meter Install one G Control PM measuring the power consumption of the home PV Generation me...

Страница 9: ...it is shown in the diagram of the previous page It must not be installed in the same point than the company smart meter 2 PV Generation meter The line connection cable from the PV inverter to the cons...

Страница 10: ...tal using the website https remotesolar elnur es or using the app Elnur Gabarron Solar Control available in App Store for IOS and Play Store for Android Enter a valid email address that must be verifi...

Страница 11: ...the Smarbox with your user account Note The automatic detection of the Smartbox will only work if the smartphone or tablet used for the process and the G Control Hub device are connected to the same i...

Страница 12: ...ectricity tariff can be modified if your tariff is different to the default ones The G Control Hub EU installation is over 3 3 G Control PM association The last step to finish the installation of the...

Страница 13: ...eter and select the type of circuit to indicate if the meter that is being linked is PV generation or home consumption meter These settings can be modified later in the Config section of the G Control...

Страница 14: ...13 NOTAS NOTES...

Страница 15: ...14 NOTAS NOTES...

Страница 16: ...iso As a part of the policy of continuous product improvement Elnur s a reserves the right to alter specifications without notice ELNUR S A Traves a de Villa Esther 11 28110 Algete Madrid Tfno Atenci...

Отзывы: