Commissioning and decommissioning
6.2 Decommissioning/ storing
Decommissioning of the machine
a) Switch the machine off.
b) If available, close the cut-off device in the inlet and outlet pipes.
c) Disconnect the machine from the power supply.
d) Depressurise the machine:
Open the pipes slowly.
The pressure reduces slowly.
e) Remove the pipes and hoses.
f) Seal the connections for inlet and outlet stubs using adhesive foil.
g) In case of continuous flow cooling discharge cooling water (Fig. 2/D
1
).
h) Drain condensate (Fig. 2/X, 3/X).
See also chapter 3.2.1, page 11
6.3 Recommissioning
a) Check the condition of the machine (cleanliness, cabling etc.).
For installation see chapter 5, page 19
For commissioning see chapter 6.1, page 25