
MP500/4N-8-16 Programming
73
4.20.6
GSM Field Test
Proceed as follows to test the GSM network signal level:
1) Enter
< Master / Installer code >
, press
and then
.
2) Press
repeatedly until TEST appears.
3) Press
and press
repeatedly until ADVANCED TESTS appears.
4) Press
and press
repeatedly until GSM FIELD TEST appears.
5) Press
.
6) The keypad will beep during the GSM signal level test. The level of the GSM signal will appear in
graphic form at the end of the test.
7) Press
repeatedly to exit from the menu.
4.20.7
Environmental listening test
It is advisable to test that this function works correctly if a KP500DV/N vocal keypad is installed in the system.
To do so, call from a telephone located outside the monitored area and follow the procedure described in paragraph
control with guided voice menu
After having activated the function, check that the signal level is good in the entire area to be monitored. Otherwise, it may be
necessary to install other vocal keypads to cover the areas in which the signal is not sufficient.
4.20.8
Final tests
Carry out the following checks in addition to the tests listed above:
Arm and disarm (total and partial) the system from the keypads using all the programmed user codes.
Arm and disarm the system using readers and/or KP500DP/N keypads, if present, using all the available keys.
Test the remote functions of the system (if a dialler is installed) from a landline, a mobile phone or via modem (external assistance
may be needed).
4.21 USER TRAINING
After having ascertained that the burglar alarm system is working perfectly, you can demonstrate the operations to be carried out on
the system to the end users.
Proceed as follows to obtain the best training results:
Directly involve all the people who will be using the system, if possible: training only one person is not a good idea becaus e this
person could forget something or may not be able to convey the information correctly to others.
Perform an operation (e.g. arm and disarm the system) and then invite everyone to repeat the procedure personally while you are
watching. You will be able to help if needed in this way.
Prompt everyone to ask any questions: the fewer doubts users have, the more easily they will be able to operate the system.
The main instructions to be provided to users are:
How to arm and disarm the system totally
How to arm and disarm the system partially
How to recognise the various indications: burglar, tamper attempt, flat battery etc. (on display and auditory indications)
How to read the events stored on the control panel (events log)
How to enable remote control (if applicable)
How to test the system periodically.
Delete the Diagnose Log at the end of the test to hand over a clean system. See paragraph
How to delete the Diagnose Log
instructions on how to delete.
UT01:MASTER
SYSTEM STATUS
UT01:MASTER
TEST
TEST
ADVANCED TESTS
ADVANCED
GSM FIELD TEST
GSM FIELD TEST
Содержание MP500/16
Страница 139: ...MP500 4N 8 16 Programming 139 ...