background image

98607000 REV-rel

 Valve Controller

Installation, Operating, & Maintenance Instructions

1-574-295-8330 
www.elkhartbrass.com

Содержание APEX-S

Страница 1: ...98607000 REV rel Valve Controller Installation Operating Maintenance Instructions 1 574 295 8330 www elkhartbrass com...

Страница 2: ...onents 6 Controls and Indicators 7 INSTALLATION 8 Install Valve Controller 8 ELECTRICAL CONNECTIONS 10 Wiring the Valve Controller 12 MAINTENANCE CALIBRATION 17 Automatic Valve Position Calibration fo...

Страница 3: ...9 Figure 3 Valve Controller Wiring 10 Figure 4 Valve Actuator Wiring 11 Figure 5 Wiring Cables and Connectors 13 Figure 6 Wiring Cables and Connectors 14 Figure 7 APEX S 1 1 Wiring Connections 15 Fig...

Страница 4: ...s Features 10 Green LEDs Indicate Open Valve Position Red LED Indicates Valve is Closed Keypad rubberized large embossed and color coded Tactile Buttons glove friendly Button actions Full Open Full Cl...

Страница 5: ...ecifications APEX S Valve Controller Supply Voltage 9 30VDC Current 0 5 A Display Module only Fuse Rating 1 A 12V 0 5 AMPS 24V Dimensions Height 3 31 32 Width 3 5 8 Depth 2 5 16 Datalink Interface CAN...

Страница 6: ...ions of 3 31 32 inches high by 3 5 8 inches wide by 2 5 16 inches deep All controls and indicators are located on the front of the module Refer to Controls and Indicators Valve with Actuator An Elkhar...

Страница 7: ...en LEDs will turn on one at a time from left to right until all 10 of the green LEDs light up indicating the valve is fully open Valve Control Buttons Two buttons open and close the valve The third bu...

Страница 8: ...s Refer to Figure 2 for layout and dimensions 2 Cut out a mounting hole according to the cutout diagram in Figure 2 and drill three holes clearance or tapped for 10 mounting screws 3 Connect the cable...

Страница 9: ...2 Valve Controller Mounting Dimensions 2 5 16 29 3 32 Recommended Panel Cutout 10 clear thru bolt with nut or tapped for 10 fasteners 3x 2 3 32 2 3 32 1 3 64 2 9 16 1 9 32 3 1 16 R 1 2 1 17 32 3 5 8...

Страница 10: ...NNECTIONS Figure 3 Valve Controller Wiring Valve Controller 6 Pin Connector Pin Signal Description 1 Power 12 24VDC 2 Ground Supply 3 NC 4 Datalink Shield 5 Datalink CAN Low 6 Datalink CAN High Pin 1...

Страница 11: ...2 Ground 3 Valve Position 5VDC 4 Valve Position Ground 5 Valve Position Signal 6 Valve Control 7 Valve Control 8 CLOSE 9 PRESET 10 OPEN 11 Datalink CAN High 12 Datalink CAN Low 12 Pin Connector Pin 1...

Страница 12: ...valve see diagram on page 16 1 Connect power and ground to the controllers Use 1 amp fuse for 12v 0 5 amp for 24v positive controller leads 2 Connect CAN wiring from the first APEX S to a CAN splitte...

Страница 13: ...12VDC GND Red Black Cable A Display Cables withTerminating Resistor P N 37542000 12 Pin Plug Connector 2 Pin Connector Butt Splice Connectors To APEX S Valve Controller 12VDC GND Red Black Cable C Va...

Страница 14: ...Resistor P N 375440NT Connectors 3 Pin Plug Connector Cable E APEX Extension Cable P N 37543002 2 P N 37543010 10 P N 37543015 15 P N 37543020 20 P N 37543030 30 P N 37543040 40 To APEX Valve Controll...

Страница 15: ...15 APEX SWiring 1 1 Connections Figure 7 APEX S 1 1 Wiring Connections A C E...

Страница 16: ...16 APEX SWiring 2 1 Connections Figure 8 APEX S 2 1 Wiring Connections A A E E F D Replaces CAN Lead with termination...

Страница 17: ...ess and hold the CLOSE button then press and hold the OPEN button After 5 seconds the red CLOSE LED will flash Code 1113 can now be entered 3 Use the OPEN button to set the first digit of the code 111...

Страница 18: ...k Inspect the valve controller wiring and valve for damage Operate all possible functions to ensure that each works normally Fully open and fully close valve to check for full range operation During v...

Страница 19: ...ve will travel to that position and stop there To program a preset position move the valve to the desired position full closed of full open or anywhere in between then press and hold the preset button...

Страница 20: ...h time the OPEN button is pressed the next LED will illuminate 2 Press the CLOSE button to move the cursor to the next digit Now all LEDs will be off and ready for the second digit to be entered Press...

Страница 21: ...ss the OPEN button once one green LED on 4 Press the CLOSE button to move the cursor to the next digit All LEDs will be off Press the OPEN button 6 times six green LEDs on 5 After 3 seconds the LEDs w...

Страница 22: ...or Probable Cause Symptom Corrective Actions A One LED blinking alternatively on the left and right sides No Valve Detected Verify the ID is Set Correctly Verify the Wiring B Left and right LEDs blink...

Страница 23: ...23...

Страница 24: ...khart Brass Manufacturing Co Inc 1302 W Beardsley Avenue Elkhart IN 46514 Tel 574 295 8330 Toll Free 800 346 0250 Fax 574 293 9914 www elkhartbrass com Email eb info safefleet net 98607000 REV rel 11...

Отзывы: