6. Preparation
6.1 General Information
1. ECP8- type Chillers are not fully-enclosed. They
are designed to be installed in a metal enclosure
(Mounting Box MB23A, MB232A, etc.). This is
typically seen with Legacy In-Wall applications.
2. This Remote Chiller is designed for indoor use only
and should not be installed outdoors or in a humid
environment.
3.
Use care when opening and removing the
packaging to prevent damage to the product.
a. Inspect the product for any shipping damage
and report it immediately to the location of
purchase. Installation of a damaged product will
void the warranty.
b.
Confirm that all parts have been included for the
proper installation of this product. Contact the
location of purchase if damaged parts are found.
NOTICE
Make sure no electrical
wiring, potable water inlet
pipes, or drain water outlet pipes will be
damaged during installation of the product.
Damage to any of these items can cause
electrical damage, fire, and/or water damage.
4.
Shut off the water supply source and disconnect
power to the electrical outlet being used to operate
the product before starting installation.
NOTICE
Mounting hardware to be
supplied by customer.
5. It is important to ensure proper ventilation. In fully
recessed drinking fountains be sure condenser
faces louver panel and is within 1/2” (13 mm) of
louver panel when panel is in place.
6.
Water inlet is 3/8” (10 mm) O.D. unplated tube.
Contractor to supply connections as required.
7. Connecting lines to be made of unplated copper.
Thoroughly flush all lines to remove all foreign
matter before connecting to chiller. If flushing does
not remove all particles, a water strainer should be
installed in supply line. This chiller is manufactured
in such a manner that it does not in any way cause
taste, odor, color or sediment problems.
7. Installation
1.
Connect chiller to building supply with a shut-off
valve and install a 3/8” (10 mm) unplated water line
between the valve and chiller. Remove burrs from
outside of water line. Insert water line into bulkhead
union until it reaches a positive stop, approximately
3/4” (19 mm).
Note:
Do not solder tubes inserted into the strainer
as damage to the O-rings may result.
2.
Electrical: Make sure power supply is identical in
voltage, cycle, and phase to that specified on chiller
serial
plate. Never wire the compressor directly to
the power supply.
8. Start-Up
.
1. Open supply line valve.
2.
Purge all air from all water lines by operating
bubbler valve of fountain to which chiller is
connected. A steady stream flow assures that all air
is removed.
3. Rotate fan blade to assure proper clearance and
free action.
4.
Connect to proper electrical power.
9. Service
For proper and safe servicing, please read these
Caution, Warning instructions completely before
servicing.
Note:
Disconnect power supply before servicing the
unit.
All service work must be performed by an
authorized service person
.
9.1 Service: Adjustments
9.1.1 Temperature Control
Factory set for 50ºF ± 5º (10ºC ± 5º) water under
normal conditions. To adjust water temperature, turn
the screw (item no. 5) on cold control clockwise for
colder, counter clockwise for warmer.
9.2 Service: Inspection/Cleaning
•
Inspect the Water Chiller twice each year for proper
operation and performance.
•
Inspection of the unit will require disconnecting
electrical supply, removal of panels, etc. and
reassembly and return to service practices.