background image

Page 8

Elkay Manufacturing Company 

  

(630) 574-8484 

 

 

2000000698 (Rev. A - 07/22)

ECP8_1J     ECP8_2J     ECP8_3J          

6. Preparation

6.1  General Information

1.  ECP8- type Chillers are not fully-enclosed. They 

are designed to be installed in a metal enclosure 

(Mounting Box MB23A, MB232A, etc.). This is 

typically seen with Legacy In-Wall applications.

2.  This Remote Chiller is designed for indoor use only 

and should not be installed outdoors or in a humid 

environment. 

3. 

Use care when opening and removing the 

packaging to prevent damage to the product.
a.  Inspect the product for any shipping damage 

and report it immediately to the location of 

purchase. Installation of a damaged product will 

void the warranty. 

b. 

Confirm that all parts have been included for the 

proper installation of this product. Contact the 

location of purchase if damaged parts are found.

NOTICE

Make sure no electrical 

wiring, potable water inlet 

pipes, or drain water outlet pipes will be 

damaged during installation of the product. 

Damage to any of these items can cause 

electrical damage, fire, and/or water damage.

4. 

Shut off the water supply source and disconnect 

power to the electrical outlet being used to operate 

the product before starting installation.

NOTICE

Mounting hardware to be 

supplied by customer.

5.  It is important to ensure proper ventilation. In fully 

recessed drinking fountains be sure condenser 

faces louver panel and is within 1/2” (13 mm) of 

louver panel when panel is in place.

6. 

Water inlet is 3/8” (10 mm) O.D. unplated tube.  

Contractor to supply connections as required.

7.  Connecting lines to be made of unplated copper. 

Thoroughly flush all lines to remove all foreign 

matter before connecting to chiller. If flushing does 

not remove all particles, a water strainer should be 

installed in supply line. This chiller is manufactured 

in such a manner that it does not in any way cause 

taste, odor, color or sediment problems.

7. Installation

1. 

Connect chiller to building supply with a shut-off 

valve and install a 3/8” (10 mm) unplated water line

 

between the valve and chiller. Remove burrs from 

outside of water line. Insert water line into bulkhead 

union until it reaches a positive stop, approximately 

3/4” (19 mm).

 

 

Note:

 

Do not solder tubes inserted into the strainer 

as damage to the O-rings may result.

2. 

Electrical: Make sure power supply is identical in 

voltage, cycle, and phase to that specified on chiller 

serial 

plate. Never wire the compressor directly to 

the power supply.

8. Start-Up

.

1.  Open supply line valve.

2. 

Purge all air from all water lines by operating 

bubbler valve of fountain to which chiller is 

connected. A steady stream flow assures that all air 

is removed.

3.  Rotate fan blade to assure proper clearance and 

free action.

4. 

Connect to proper electrical power.

9. Service

For proper and safe servicing, please read these 

Caution, Warning instructions completely before 

servicing. 

 

Note: 

Disconnect power supply before servicing the   

 

   unit.

 

         

All service work must be performed by an  

 

 

   authorized service person

.

9.1  Service: Adjustments

9.1.1  Temperature Control

Factory set for 50ºF ± 5º (10ºC ± 5º) water under 

normal conditions. To adjust water temperature, turn 

the screw (item no. 5) on cold control clockwise for 

colder, counter clockwise for warmer.

9.2  Service: Inspection/Cleaning

• 

Inspect the Water Chiller twice each year for proper 

operation and performance.

• 

Inspection of the unit will require disconnecting 

electrical supply, removal of panels, etc. and 

reassembly and return to service practices.

Содержание ECP8

Страница 1: ...ECP8_1J ECP8_2J ECP8_3J 630 574 8484 Elkay Manufacturing Company 2000000698 Rev A 07 22 Page 1 ECP8 Refrigeration Packages INSTALLATION CARE AND USE MANUAL...

Страница 2: ...2 6 Warranty 5 3 Installation Preparation Read Before Beginning Installation 7 4 Tools and Supplies 7 4 1 Tools Required 7 4 2 Installer Supplied Parts 7 4 3 Tools Items required but not provided 7 5...

Страница 3: ...y Alert Symbol and followed by a signal word such as WARNING or CAUTION 1 3 Definitions DANGER The signal word that indicates a hazard with a high level of risk which if not avoided will result in dea...

Страница 4: ...rior to any maintenance make sure the unit is unplugged and circuit breakers are turned OFF Prior to installation test for live circuits or wiring inside the wall before cutting or drilling into the w...

Страница 5: ...ust be installed properly by trained service person 2 2 Disclaimer The information contained in this Installation Use Care Manual is given free of charge It is based upon technical data which we belie...

Страница 6: ...Page 6 Elkay Manufacturing Company 630 574 8484 2000000698 Rev A 07 22 ECP8_1J ECP8_2J ECP8_3J...

Страница 7: ...risk of water damage Thoroughly flush all water lines and fittings of all foreign matter before connecting to chiller If inlet pressure is above 100 psig 0 69 MPa a pressure regulator must be installe...

Страница 8: ...foreign matter before connecting to chiller If flushing does not remove all particles a water strainer should be installed in supply line This chiller is manufactured in such a manner that it does no...

Страница 9: ...or cycling on the compressor overload protector 9 2 3 Waterflow Make sure that the water flow is proper If water flow is slow then inspect the filter or in line strainer for restriction Replace the fi...

Страница 10: ...rt DESCRIPTION 2 6 7 8 0000000244 0000000245 1000002147 1000002146 98751C 98752C 31506C PART NO Kit Fan Mtr Blade Nut Shroud 50 Hz Kit Fan Mtr Blade Nut W O Shrd 60 Hz Comp Serv Pak 50 Hz Comp Serv Pa...

Отзывы: