PAGE 1
97461C (Rev. SIC - 1/11)
4595FR_FTN LK4595FR_FTN LK4595SFR_FTN
Owners Manual
4595 Freeze Resistant Pedestal Barrier Free Stone Fountain
4595FR Fountains are among the easiest to install Fountains on the market today. To assure
you install these models easily and correctly, PLEASE READ THESE SIMPLE INSTRUCTIONS
BEFORE STARTING THE INSTALLATION. CHECK YOUR INSTALLATION FOR COMPLIANCE
WITH PLUMBING, ELECTRICAL, AND OTHER APPLICABLE CODES. After installation, leave
these instructions with the Fountain for future reference.
IMPORTANT
ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON
IMPORTANT
THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO WATER LINES IS A
COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCUR AWAY FROM THE BUILDING. THIS
GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTO A FOUNTAIN, CREATING AN ELECTROLYSIS WHICH CAUSES A
METALLIC TASTE OR AN INCREASE IN THE METAL CONTENT OF THE WATER. THIS CONDITION IS AVOIDABLE BY USING
THE PROPER MATERIALS AS INDICATED. ANY DRAIN FITTINGS PROVIDED BY THE INSTALLER SHOULD BE MADE OF
PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING PLUMBING SYSTEM.
INSTALLER
STOP!
PLEASE READ THE FOLLOWING
INFORMATION.
• INSTALLATION INSTRUCTIONS FOR THE 4595FR FTN.
WITH 97482C DUAL VALVE CONTROL ASSEMBLY ARE
LOCATED ON PAGES 2 - 5.
• INSTALLATION INSTRUCTIONS FOR THE 4595FR FTN.
WITH SANITARYFR2 VALVE ARE LOCATED ON PAGES
6 - 12.