background image

 
 

 

 

www.elitescreens.com

 / 

[email protected]

 / 877-511-1211 

 

Assembling dimension instruction:

 

 Unit: 

INCH/ CM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание Ceiling Trim Kit

Страница 1: ...www elitescreens com info elitescreens com 877 511 1211 Ceiling Trim Kit ...

Страница 2: ...reens com info elitescreens com 877 511 1211 Nomenclature for the Elite Screens Ceiling Trim Kit For your convenience the components have been numbered in correspondence with a brief description and detail picture ...

Страница 3: ...info elitescreens com 877 511 1211 left installation plank Suspension Bar 4PCS 39 1000 80mm each assembly bolt nut 10PCS mounting screw 8PCS right installation plank 1PC right bracket 1PC left bracket 1PC ceiling panel 2PCS ...

Страница 4: ...ill pass through the assembly bar and attach to the brackets Step 2 Install the ceiling panel Use 7 mounting screws to attach the left and right installation planks Note Left Right is designated from the perspective of the viewer looking at the projection surface www elitescreens com info elitescreens com 877 511 1211 ...

Страница 5: ...www elitescreens com info elitescreens com 877 511 1211 Step 3 Attach the 4 suspension bar using 8 Screws type Overlap hanging bar to determine various length you need in the ceiling ...

Страница 6: ...www elitescreens com info elitescreens com 877 511 1211 Assembling dimension instruction Unit INCH CM ...

Страница 7: ...l send out a new unit to the customer by ground service subject to inventory availability Should a problem be reported after the 7 day grace period the item must be shipped to us for warranty repair Missing Parts must be reported within the 7 day DOA grace period If reported after 7 days customer will be only be responsible for shipping and handling fees up to 30 days If reported after 30 days of ...

Отзывы: