background image

PURELAB Option-Q 7/15

 

- US

 

Operator Manual

Содержание PURELAB Option-Q 7/15 - US

Страница 1: ...PURELAB Option Q 7 15 US Operator Manual...

Страница 2: ......

Страница 3: ...Ltd The copyright and all restrictions on reproduction and use apply to all media in which this information may be placed VWS UK Ltd pursue a policy of continual product improvement and reserve the r...

Страница 4: ...INSTALLATION INSTRUCTIONS 12 5 1 Unpacking the PURELAB Option Q 12 5 2 Positioning the PURELAB Option Q 12 5 3 Connecting up the PURELAB Option Q 14 5 4 Initial Controller Set Up 17 5 5 Initial Start...

Страница 5: ...tor Manual PURELAB Option Q 7 15 US Version 3 02 16 Page iii 11 1 Icons 41 11 2 Alarm Conditions 41 11 3 Replacement Timers 41 11 4 Low Level Quality and Standby Alarms 42 12 WARRANTY CONDITIONS OF SA...

Страница 6: ......

Страница 7: ...RELAB Option Q15 BP US with boost pump 1 2 Use of this Manual This manual contains full details on installation commissioning and operation of the PURELAB Option Q unit If this unit is used contrary t...

Страница 8: ...ny items are changed or maintenance work performed The ON OFF switch is located at the left hand side of the unit The mains power lead is located just behind the ON OFF switch WARNING THIS APPLIANCE M...

Страница 9: ...or material safety data sheets EfferSan and Minncare Cold Sterilant are EPA registered as a sterilant high level disinfectant and sanitizer EfferSan and Spent Minncare Cold Sterilant are acidic and re...

Страница 10: ...provides a reservoir of 25 liters of highly purified water The PURELAB Option Q can also be operated with alternative reservoirs providing the level control interface is compatible See Section 10 Con...

Страница 11: ...ng feedwater The pre treated water then passes the sanitization port and through one or two reverse osmosis cartridges set up in series which split the flow into permeate and concentrate streams The p...

Страница 12: ...Inlet Portable water inlet Sanitization Port Strainer Solenoid Pre treatment LC140 Ion exchange Cartridge pack LC163 Concentrate Drain NRV LC118 UV Temp sensor Water quality sensor NRV Pump feed from...

Страница 13: ...internal boost pump 6 0 bar 90 psi 6 0 bar 90 psi Minimum without internal boost pump 4 0 bar 60 psi 4 0 bar 60 psi Maximum with internal boost pump 2 0 bar 30 psi 2 0 bar 30 psi Minimum with internal...

Страница 14: ...dicators Reverse osmosis permeate water Conductivity De ionized water Temp compensated resistivity conductivity Temperature Degrees centigrade Reservoir Full Pre treatment cartridge Maximum remaining...

Страница 15: ...ion Q15 Make Up Rate 7 5l hr 15l hr Daily Output nominal max 180 l 24 hour day 360 l 24 hour day Dispense Rate from Tap 1 0 l min nominal less with POU filter 1 0 l min nominal less with POU filter Ou...

Страница 16: ...7 15 US Version 3 02 16 PURELAB Option Q Reverse Osmosis Capacity Charts Option Q7 Flow l hr Pressure bar Graph 1 Nominal Flowrate vs Inlet Pressure for PURELAB Option Q7 Option Q15 Flow l hr Pressure...

Страница 17: ...dow and three program function control buttons Details of how to use the controls will be given in the appropriate sections Control Button Function PROCESS Turns the process ON OFF The PURELAB Option...

Страница 18: ...be installed on a flat level surface in a clean dry environment The unit can also be wall mounted against a vertical wall capable of supporting the weight for this we recommend the use of the wall mo...

Страница 19: ...ty and comply with specifications provided This should enter the unit via an 8mm 5 16 O D semi rigid tube and should be in the temperature range 1 to 35 C CAUTION Operating temperatures outside the ra...

Страница 20: ...Re circulation from reservoir or DV25 Outlet to reservoir or DV25 Step 1 Fitting Tubes 1 PUSH in collet on connector 2 PULL out transit plug 3 CUT a clean square end on an 8mm 5 16 OD semi rigid drai...

Страница 21: ...e socket on the left hand side of the PURELAB Option Q unit 2 PLUG mains lead into mains socket Step 3 Connect High Low Level Switch to Reservoir 1 INSERT jack plug into the level control socket locat...

Страница 22: ...4 Open the front door 5 Remove the LC163 cartridge See Section 7 2 6 Unscrew the two panel fixing screws located on the right hand side of the door opening 7 Remove side panel by sliding the panel to...

Страница 23: ...up menu sequence A series of set up screens will now be displayed Various control icons are used to allow you to step through the set up instruction process These icons include A scroll icon indicated...

Страница 24: ...n and accept with the button Note To reset any of the set up parameters restart from the set up menu and follow instructions from Step 1 Setting Up Display and Replacement Timer Turn the unit off at t...

Страница 25: ...initiate reset Press to reset timer or press to abort reset Press to jump to the next consumable Step 4 Accessing the Process On Display Screens The normal process screen will display newly installed...

Страница 26: ...e at the reservoir outlet and direct to a drain or sink 6 The unit is supplied without the LC163 ion exchange cartridge pack fitted but has the by pass block in place as shown in Section 8 7 ENSURE th...

Страница 27: ...If the unit is not processing press PROCESS to start it Wait until the water purity reaches the preferred purity level before use Dispense water from the dispense tap by pulling the tap handle forwar...

Страница 28: ...he pre treatment cartridge See Section 7 1 UV failure The UV failure alarm is signalled by an audible alarm and flashing cross over the replace UV icon Press the button to mute the audible alarm Follo...

Страница 29: ...ect Fault Alarm The reservoir level disconnect fault alarm condition will signal with an audible alarm and flashing icon Press the button to mute the alarm This alarm condition will cause the process...

Страница 30: ...debris in the water the unit incorporates two strainers WARNING ALWAYS CHECK THAT THE MAINS ELECTRICAL POWER AND FEED WATER SUPPLIES ARE SWITCHED OFF BEFORE ATTEMPTING TO CHANGE THE PURELAB OPTION Q C...

Страница 31: ...rom the elbow at the top of the cartridge 5 REMOVE exhausted cartridge from retaining clips and discard Note The consumable is non hazardous Dispose of as ordinary waste observing all local and nation...

Страница 32: ...EXCHANGE CARTRIDGE Step 2 Remove Ion exchange Cartridge 1 OPEN the front door 2 PUSH on cartridge top cap 3 LIFT up cartridge 4 SLIDE out cartridge 5 DISCARD used ion exchange cartridge Note The consu...

Страница 33: ...it 5 UNPLUG the white lamp plug fitted to the bottom of the UV unit CAUTION Hold on to the pins on the lamp in case the lamp falls out and breaks Step 3 Remove Lamp Plates 1 UNDO screws in plate at to...

Страница 34: ...bottom of the unit 4 TIGHTEN screws on the plate 5 FIT plate on top of UV lamp assembly Step 7 Assemble UV LC118 1 PLUG the white lamp clip into the bottom of the UV unit 2 REFIT spring clip 3 PLUG in...

Страница 35: ...or clean as necessary Step 3 Reassemble the Re circulation Strainer 1 INSERT mesh filter into strainer ENSURE it is facing the correct direction 2 SCREW up the re circulation strainer Step 4 Replace t...

Страница 36: ...E IN CONTACT WITH SKIN OR EYES ALWAYS FOLLOW RECOMMENDATIONS FOUND IN THE MANUFACTURERS MATERIAL SAFETY DATA SHEET AND ANY APPLICABLE OSHA STANDARDS FOR THE CHEMICAL BEING USED WARNING LABEL THE MACHI...

Страница 37: ...ps If the chemical level rises too high in the sanitization port refit the cap and then remove it This will allow room for the remaining 10ml 3 REFIT cap on sanitization port Step 3 By pass Block 1 RE...

Страница 38: ...DIRECT the outlet tube to drain 3 RESTORE the power 4 PRESS the PROCESS button and leave the system to rinse for 20 minutes Note during this period the recirculation pump will operate intermittently...

Страница 39: ...the delivery system docking vessel reservoir The deliver system and docking vessel reservoir may be sanitized to destroy bacteria within the pipework and filters of the unit This sanitization of the s...

Страница 40: ...IN THE MANUFACTURERS MATERIAL SAFETY DATA SHEET AND ANY APPLICABLE OSHA STANDARDS FOR THE CHEMICAL BEING USED WARNING LABEL THE MACHINE WITH APPROPRIATE WARNING SINGS SUCH AS DO NOT USE CONATAINS STER...

Страница 41: ...button to start the re circulation process 9 ALLOW the sanitization cycle to continue for 30 minutes 10 PRESS the PROCESS button to stop the re circulation process 11 TURN electrical supply off Step...

Страница 42: ...on port 2 INSERT ONE EfferSan tablet 3 REFIT cap on sanitization port hand tight Step 3 Insert Tablet into Sanitization By pass Block 1 UNSCREW cap on sanitization by pass block 2 INSERT ONE EfferSan...

Страница 43: ...is recommended that the system is flushed overnight 6 PRESS the process button to stop the system flushing 7 ENSURE the electrical power supply is switched off Step 8 Remove By pass Block 1 PUSH and T...

Страница 44: ...ce in heavy duty plastic bag Do not return to original container Wash away any residues with copious amounts of water Toxicity Serious risk of poisoning by inhalation or ingestion Irritating to skin e...

Страница 45: ...Section 7 2 Replacing the LC163 Ion exchange cartridge Pre treatment cartridge replacement alarm Replace pre treatment cartridge See Section 7 1 Replacing the LC140 pre treatment cartridge Water purit...

Страница 46: ...ication and feed water quality Care should be taken to order the correct consumable items Required for reservoirs LA611 LA612 LA613 Required for optional pre treatment filter housing LA518 Accessory C...

Страница 47: ...ursor Option Choice Cursor Selection Choice Cancel Reset Printer 11 2 Alarm Conditions Icon Alarm Conditions Replace Ion exchange Cartridge Replace UV Lamp Replace Pre treatment Cartridge UV Fail Cros...

Страница 48: ...Operator Manual ELGA Page 42 PURELAB Option Q 7 15 US Version 3 02 16 11 4 Low Level Quality and Standby Alarms Screen Description Low level alarm Process on and water purity alarm Standby and purity...

Страница 49: ...er notifies VWS UK Ltd promptly of any such defect The exclusive remedy provided herein shall not be deemed to have failed of its essential purpose so long as VWS UK Ltd is willing and able to repair...

Страница 50: ...its process systems Products or components manufactured by companies other than VWS UK Ltd or its affiliates Non VWS UK Ltd products are covered by the warranty if any extended by the Product manufact...

Страница 51: ...ELGA LabWater Lane End Industrial Park High Wycombe Bucks HP14 3BY UK Tel 44 0 203 567 7300 Fax 44 0 203 567 7205 E mail techsupport elgalabwater com For the address of your nearest ELGA LabWater Sale...

Отзывы: