background image

Содержание Elgastat Option 4 Series

Страница 1: ......

Страница 2: ...V 50Hz 110 120V60Hz 90 110V60HZ The manual contains full details on installation commissioning and operation of the unit purchased If however you have any queries please contact your local distributor...

Страница 3: ...n 4 Reverse Osmosis Capacity Calculations 13 6 START UP PROCEDURE 14 6 1 Start Up Procedure for Option 4 units 14 7 FITTING REPLACEMENT CARTRIDGE 1 8 7 1 Replacing the LC101 Pre treatment cartridge 18...

Страница 4: ...sipate prior to removal of any cartridges Switching off the electricity will isolate the source of pressure on those units requiring an electrical supply On those unit without requirement for electric...

Страница 5: ...urified water is produced under pressure thus not requiring the gravity collection required by stills Briefly within the Option 4 unit there is an inlet solenoid valve which controls theflow of mains...

Страница 6: ...f Switch Mains Plug Turn Fastener Water Inlet Blue Prismatic Window UV VIEW LEFT HAND SIDE Removable Right Hand Cover Turn Fastener Plug In Level Controls Purified Water Outlet Dispense Tap Pump Feed...

Страница 7: ...DPushln y 5 16 ODPushln 5 16 OD Push In 220 240v 50Hz Standard 110 120v 60Hz Standard 90 110v60Hz Special 81 5 VA 2A All Models Green LED Amber LED Red LED Green LED Red LED Automatic High Intermediat...

Страница 8: ...hour 100 litres based on 24 hour day 4 litres hour 5Mn cm 25 C 0 001 AU 254nm 50 ppb 1 CFU ml 0 2 i filtration optional effectively neutral 30 litres hour 200 litres based on 24 hour day 8 litres hour...

Страница 9: ...backpressure on the reverse osmosis module and leaves the unit via the drain connection onthe right hand side ofthe unit This drainflow should never be restricted further otherwise scaling on the RO...

Страница 10: ...k Outlet FIG 2 PURIFICATION TECHNOLOGIES WITHIN THE ELGASTAT OPTION 4 Process LED Amber Power On LED Green Water Good LED Green Change Cartridge LED Red SYSTEM STATUS WATER GOOD CHANGE CARTRIDGE POWER...

Страница 11: ...ct the Elga Service Division or your local distributor Normally 2 1 bar 30 psi is the minimum practical pressure for operation a boost pump is available where pressures are inadequate Details of the E...

Страница 12: ...nit and connect to a potable water supply Connection to the potable water supply should be via an isolating valve on the mains supply fitted with a tube connector capable or accepting a 5 16 8mm OD ny...

Страница 13: ...ld be open when the water level is above this mark and closed when the water level drops below this mark 3 Install the low level switch approximately 1 2 cm above the inlet to the pump The low level s...

Страница 14: ...dark grey Blanking Transit Plug Pull Plug Depress Collet Clean Square Cut End Simply push in tube to attach Tube is secured in position FIG 4 TUBE CONNECTOR DETAILS Tube Nylon 5 16 OD or 8 00 mm Opt 4...

Страница 15: ...OPTION 4 UNIT STORAGE TANK 25L Level Controls Inlet 30 90psi Q OPTION 4 Outlet Pump Feed To Drain O High O Int O Low FIG 5 OPTION 4 UNIT INSTALLED WITH STORAGE TANK Opt 4 Issue 2 05 93 12...

Страница 16: ...1 16 STEP1 Obtain the nominal flowrate at the operating pressure from Graph 1for Option 4A and Graph 2 for Option 4B Nominal Flowrate L Hour STEP 2 Multiply the nominal flowrate by the temperature cor...

Страница 17: ...hange cartridge Thisshould be ignored at this stage 8 Having checked that the water supply has been turned on and the level control DIN plug is connected press the PROCESS button the inlet solenoid wi...

Страница 18: ...er will pass through the unit and start to fill the storage tank if the red STANDBY light is illuminated Allow the unit to fill the tank for 15 minutes and then press the PROCESS button to switch the...

Страница 19: ...Cartridge Adaptor By Pass Block Top Cartridge Guide Securing Screw Bottom Cartridge Guide FIG 6 OPTION 4 UNIT WITHOUT CARTRIDGE PACK FITTED Opt 4 Issue 2 05 93 16...

Страница 20: ...Cartridge Adaptor Securing Screw Top Cartridge Guide Bottom Cartridge Guide LC 117 Cartridge Pack FIG 7 OPTION 4 WITH LC117 CARTRIDGE PACK FITTED Opt 4 Issue 2 05 93 17...

Страница 21: ...ency are estimates only and will depend on the application and feedwater quality 7 1 Replacing the LC101 Pre treatment cartridge 1 Switch off electrical supply and remove mains lead then ensure the wa...

Страница 22: ...TER Drain Outlet LC 105 UV LAMP LC 101 ETREATMENT CARTRIDGE EVERS CARTl LC E OSMOSIS ID E 102 Inlet LC 102 REVERSE OSMOSIS CARTRIDGE LC 117 D I CARTRIDGE PACK FIG 8 ELGASTAT OPTION 4 REPLACEMENT CARTR...

Страница 23: ...mination during storage The RO cartridges will therefore require rinsing prior to use Details of the rinsing procedure can be found in Section 6 Start Up Procedures N B The Dl cartridge pack should be...

Страница 24: ...lbow and pipe here NOTE Disinfection port not shown in place to provide view on LC102 cartridge See Fig 11 RO Cartridge Outlet l FIG 9 VIEW OF OPTION 4 UNIT WITH LEFT HAND COVER REMOVED Opt 4 Issue 2...

Страница 25: ...ack and then remove the exhausted cartridge from the unit 5 Unpack a new LC117 cartridge and remove the yellow plugs from the inlet and outlei ports at the top of the pack 6 Insert the new cartridge p...

Страница 26: ...y prising off the white coloured end clips and wires situated at either end of the UV housing end caps Once the end clips have been removed the lamp can be pulled out through the top of the housing 9...

Страница 27: ...White Coloured End Clip UV Housing FIG 10 VIEW OF UV HOUSING WITH FRON SiVER Opt 4 Issue 2 05 93 24...

Страница 28: ...the tank the inlet solenoid valve will open and the incoming water will dissolve the sanitising tablet in the disinfection port and pass through the Reverse Osmosis cartridges and throughout the unit...

Страница 29: ...Rotate Bowl to Remove Disinfection Port Bowl FIG 11 VIEW OF DISINFECTION Opt 4 Issue 2 05 93 26...

Страница 30: ...s Pack No 1P301 Pack of Two Individual lndi Indiv Indiv idual idual idual r Replacement frequencies are estimates only and will depend on the application an i feedwater quality A packs and spar pc is...

Страница 31: ...9ELGA The PureWater People nefend England HP143JH 1393 007...

Страница 32: ...wn to prevent the ingress of unfiltered air The instructions for connecting level controls are included inside the terminal box fitted to the back of the reservoir They are also in the relevant produc...

Страница 33: ...option available 3A 3 INSTALLATION Fig 1 shows the external features of the Boost Pump showing the inlet outlet connections overflow outlet pressure gauge and pressure control valve The unit also has...

Страница 34: ...s been completed when operating with Prima 1 3 units 4 7 The Boost Pump will operate continuously in this mode until the downstream equipment ceases to require water This may be when the downstream eq...

Страница 35: ...ns Support the top of the strainer when removing the bowl to prevent damage to the inlet outlet pipework Ensure the Boost Pump is isolated from the water and electrical supplies and the feed water pre...

Страница 36: ...s an LED panel on the right hand side to indicate the status of the Boost Pump 3 1 3 2 3 3 3 4 3 5 Outlet pressure Outlet flow Electrical Requirements Fuse Rating max 6 2 bar 90 psi adjustable between...

Страница 37: ...nse period has been completed when operating with Prima 1 3 units 4 7 The Boost Pump will operate continuously in this mode until the downstream equipment ceases to require water This may be when the...

Страница 38: ...ditions Support the top of the strainer when removing the bowl to prevent damage to the inlet outlet pipework Ensure the Boost Pump is isolated from the water and electrical supplies and the feed wate...

Страница 39: ...o prevent the ingress of unfiltered air The instructions for connecting level controls are included inside the terminal box fitted to the back of the reservoir They are also in the relevant product ma...

Отзывы: