background image

WATER PURIFICATION

Operator Manual

®

MANU41319   VERSION D  08/20

Part No. LA824

DRAF

T

07/8/2020

Содержание PURELAB

Страница 1: ...WATER PURIFICATION Operator Manual MANU41319 VERSION D 08 20 Part No LA824 DRAFT 07 8 2020...

Страница 2: ...YOUR GUIDE TO THE CHORUS...

Страница 3: ...e Operation Page 23 8 1 Set Alarm Points Page 23 8 2 Advanced Data Logging Page 23 8 3 Software Update Page 23 9 Troubleshooting Page 24 25 10 Technical Specifications Page 26 11 Warranty Conditions o...

Страница 4: ...o the equipment associated equipment and processes Material safety data sheets covering the consumables are available upon request Note Ensure the consumables are disposed of in accordance with local...

Страница 5: ...s not supplied EN14126 EN388 EN374 Tape Measure Plastic Pipe Cutters Tube Keys Goggles 3mm Drill Bit Drill Phillips Screw Driver Power Handset Labels COMMS 1 X 1 X SUPPLIED PARTS HEALTH AND SAFETY NOT...

Страница 6: ...on detailed in the front of the Quick Start Guide Failure to observe these instructions could result in damage to the equipment and associated equipment resulting injury or death ELGA VEOLIA Tel 44 0...

Страница 7: ...spenser Port 5 Return 6 5 7 Example 2 1 X PURELAB Quest RO DI UV or RO DI 1 X PURELAB Dispenser LA824 Wall Mounting Bracket LA735 Wall Mounting Bracket LA735 INST39088 Air Break Device 2 Max Distance...

Страница 8: ...reservoir is full open reservoir port 4a manual valve to Chorus 1 port 1 Feedwater inlet and continue to commission Chorus 1 with the PURELAB Dispensers connected 3 Chorus 1 is set in pre commisionin...

Страница 9: ...5 1 Halo 5 Halo 9 Halo 7 Halo 6 Halo 1 Halo 8 5 5 3 5 3 4 7 J1 J2 J1 1 6 6 4 8 9 7 1 4a 5 3 3 4 8 9 5 6 1 See Chorus 1 system configuration notes See Chorus 1 system configuration notes 4a Dispenser...

Страница 10: ...r Break Device Air Break Device Air Break Device 7 J2 5 1 Halo 9 Halo 8 Halo 1 5 3 5 3 4 7 J1 6 3 5 4 8 9 1 6 7 4a J2 1 3 4 5 9 6 8 1 See Chorus 1 system configuration notes See Chorus 1 system config...

Страница 11: ...nected redirecting reservoir port 4b to drain during this procedure Please refer to operator manual MANU40932 section 5 5 for commissioning instructions Existing system configuration If you are connec...

Страница 12: ...notes Potable Mains Feedwater Connection Reservoir Overflow Air Break Device 1 3 4b 4a 4 6 5 1 7 Chorus Reservoir 15L or 30L 1 5 Max Distance 5000mm Max Distance 5000mm Max Distance 5000mm Dispenser...

Страница 13: ...0932 section 5 6 for commissioning instructions 3 Once commissioning is completed the internal EDI filter module will need bleeding before purified water can be dispensed from the Chorus 2 tap or disp...

Страница 14: ...e Mains Feedwater Connection Reservoir Overflow Air Break Device 1 3 2 4b 4a 4 6 5 1 7 Chorus 2 EDI Chorus Reservoir 15L or 30L 1 5 Max Distance 5000mm Max Distance 5000mm Max Distance 5000mm Dispense...

Страница 15: ...own Fig 1 c Press and hold the height adjustment button to slide the handset arm up and down Fig 3 b Rotate the handset Fig 2 d When you have found the perfect height release the hight adjustment butt...

Страница 16: ...ent please skip to section 7 in the Quick Start Guide if you do not need to fit this sercuring bracket Items not supplied EN388 EN374 Phillips Screw Driver 3mm Drill Bit Drill Goggles Caution Please r...

Страница 17: ...bit Fig 7 3mm a Reassemble the mounting bracket back onto the base as shown above Fig 8 a Insert the fixing screws into the screw cap washers Fig 9 Screw cap Fixing Screw Screw cap washer b Fix the s...

Страница 18: ...bends provided to mould the tube into position Fig 13 b Using the tube supplied firmly push one end securely into Port 1 inlet connection Use the flow bends provided to mould the tube into position F...

Страница 19: ...ES CONNECT THE POWER CABLES 9 10 a Link the comms cables as shown above connections may vary depending on your system configuration Fig 14 a Link the power cables as shown above connections may vary d...

Страница 20: ...sing a For new system system configurations follow the on screen commissioning instructions Fig 18 b After completing the commissioning procedure please wait for the reservoir to fill and reach full p...

Страница 21: ...t See Quick Start Guide section 2 for details 1 6 Commissioning Please refer to the main product operator manuals for commissioning a new system configuration 1 7 Customer Support If you need help wit...

Страница 22: ...exible Dispenser Tube Auto Volume Button Dispense Button Water Purity Display Scrolling information bar bar indicating the status Auto Volume or Reservoir Volume Up Button Accept Button Down Button Di...

Страница 23: ...ming an operation Button Operation Scroll Up Button Press to scroll up on a menu or volume increments increase in a feature Scroll Down Button Press to scroll down on a menu or volume increments decre...

Страница 24: ...d serial number can be found on the ratings plate see below Model number Serial number Enter the model and serial number into the online form at https www elgalabwater com support register a product E...

Страница 25: ...together to start continuous dispense Press dispense button to exit this feature Press Auto Volume dispense button at anytime to open this feature Press up and down buttons to scroll throught the vol...

Страница 26: ...n once to deactivate Press and hold accept button for 2 seconds to enter the Main Menu Press up and down buttons to scoll throught the main menu options tabs press accept button to confirm your select...

Страница 27: ...oupler is not required for PURELAB Dispenser screw in the Point of Use filter Fig 4 3 Slightly open both bleed valves before dispensing any water to release any trapped air Fig 5 4 Press the dispense...

Страница 28: ...Scroll and select an interval data recording time press accept to confirm Fig 3 4 To finish recording press the down and remove the USB Fig 4 5 Downloaded Data files can be viewed on your PC or Mac 8...

Страница 29: ...1 Complete a Sanitization Procedure See main product operator manual for instructions Message Displayed UV Lamp Change Reminder Some main products do not have a UV Lamp so this message may not appear...

Страница 30: ...uct operator manual for instructions Water Purity Alarm is active during commissioning procudure see quick start guide for details Message Displayed System configuration error 1 check connections ensu...

Страница 31: ...tion Free standing on a worktop or secured to a worktop using the mounting bracket provided see quick start guide for details Electrical Requirements Mains Input 100 240 VAC 50 60 Hz Power Required 24...

Страница 32: ...ARTICULAR PURPOSE The warranty provided herein and the data specifications and descriptions of the VWS UK Ltd systems appearing in VWS UK Ltd published catalogues and product literature may not be alt...

Страница 33: ......

Страница 34: ...ment is the property of VWS UK Ltd trading as ELGA Veolia and is supplied without liability for errors or omissions VWS UK Ltd 2020 All right reserved ELGA PURELAB are registered trademarks of VWS UK...

Страница 35: ...WATER PURIFICATION Operator Manual MANU41319 VERSION D 08 20 Part No LA824 DRAFT 07 8 2020...

Отзывы: