02/02/22
User Manual CPS/M 62000584_05
23
3.
INSTALLATION
3.1
GENERAL NOTES
3.1.1
INSPECTION
After unpacking the product, please inspect any damage that may have occurred during the
shipment. Save all packing materials in case the product has to be returned one day. If any
damage is found, please file a claim with the carrier immediately. Do not return the product to the
factory without obtaining the prior Return Merchandise Authorization (RMA) acceptance from
ELETTROTEST S.P.A.
3.2
POWER CABLING
3.2.1
CPS/M 1000 | CPS/M 2500 | CPS/M 5000
•
Open the back terminal working on the two lateral hooks with a screwdriver.
•
Open the appropriate cable glands.
•
Join one supplying cable 2P+G of suitable section (two cable of 2.5mmq for each phases).
•
Make sure that the phases are connected with the indicate sequence.
•
Connect cable load with appropriate dimension.
•
Close the cable glands.
•
Close the terminal cover securing it on the two lateral hooks.
•
Optionally: Connect the sense wires
•
Keep free under and lateral area for ventilation
•
When the CPS is mounted inside a cabinet you must do a ventilation to extract the hot air.
1
2
3
4
5
6
L
N
EART
Содержание 99112103
Страница 15: ...02 02 22 User Manual CPS M 62000584_05 15 1 4 2 CPS M 10KVA 483 270 6U 537 507 84TE MAX 540mm 510mm ...
Страница 29: ...02 02 22 User Manual CPS M 62000584_05 29 3 4 WIRING DIAGRAM 3 4 1 2 WIRE CONFIGURATION ...
Страница 30: ...02 02 22 User Manual CPS M 62000584_05 30 3 4 2 4 WIRE CONFIGURATION ...
Страница 50: ...02 02 22 User Manual CPS M 62000584_05 15 2 2 2 CPS M 10KVA 483 270 6U 537 507 84TE MAX 540mm 510mm ...
Страница 63: ...02 02 22 User Manual CPS M 62000584_05 28 4 5 SCHEMI DI CABLAGGIO 4 5 1 CONFIGURAZIONE 2 WIRE ...
Страница 64: ...02 02 22 User Manual CPS M 62000584_05 29 4 5 2 CONFIGURAZIONE 4 WIRE ...