background image

14 

THE GAS CIRCULATION SYSTEM 

The fan units pick up the cooler incubator atmosphere which has  been forced to the top of the incubator 
and first passes it over the warm heater. This warmer gas is now forced down the channel at the back of 
the cabinet then it passes under the bottom shelf of the incubator where it first meets the sachets of 
Conditioner and then the sachets of Catalyst. The gas now gives up just sufficient of  its heat to maintain 
the required temperature before finding its way back to  the top of the incubator due to the suctional force 
of the fan.  

CHANGING THE CATALYST AND CONDITIONER 

The sachet of Catalyst and the sachet of Conditioner which are housed beneath the bottom shelf of the 
incubator will require replacing at a period in excess of one year. If for any reason the sachet of catalyst  
gets wet, the contents can be dried out by heating to a temperature of 160

°

C for a period of two hours. 

The sachet of conditioner can, if necessary, be dried at room temperature. The chemicals can then be 
returned to their respective containers for further use. .  

When replacing the sachets, ensure that the sachet of Atmospheric Conditioner is at the REAR of the 
cabinet so that the gas passes over it first. (See sketch below) 

CLEANING 

The inside of the cabinet can be swabbed out with a weak solution of general laboratory detergent and 
warm water, and dried with a soft cloth. In the event of a culture spillage, a 5% Hypochlorite solution 
should be applied to the area and left for half an hour. It should then be wiped and swabbed with a 1% 
solution of Sodium Thiosulphate. Remove the catalyst and conditioner from the unit while the Hypochlorite 
solution is being used. 

Sachet placed in workstation through transfer lock 

Содержание AW200SG MINI MICRO

Страница 1: ...ANAEROBIC WORKSTATION AW200SG MINI MICRO MANUAL PLEASE READ THIS MANUAL CAREFULLY BEFORE OPERATION Burnt Mill Elizabeth Way Harlow Essex CM20 2HU UK 44 45 met munro group co uk MUNRO 6 22...

Страница 2: ...NING THE CABINET 8 10 CHECKING THE GAS FLOW 9 11 WORKING INSIDE THE CABINET WITH BARE HANDS 10 12 SLEEVE ASSEMBLY 11 13 REMOVAL OF CONDENSATION FROM INSIDE THE INCUBATOR 12 14 THE WATER GAS TAP TUBE 1...

Страница 3: ...socket Condensation drain bottle Removable exterior port covers complete with retaining clips Bare hand operation ports Catalyst Conditioner Electric supply Gas inlet 6mm push in tube Shelf Bottom doo...

Страница 4: ...TION CAPACITY 200 Petri Dishes DOOR SEALING Manual GAS Mixed Gas 10 H2 10 CO2 80 N2 OXYGEN REMOVAL FROM AIRLOCK Positive Pressure flushing FABRICATION MATERIAL Acrylic OVERALL DIMENSIONS Length 27 686...

Страница 5: ...35L min The diameter of the pipes connecting the cylinder to the cabinet should be selected according to the length of run to give a minimum pressure drop this will give maximum gas utilisation The c...

Страница 6: ...ssure in bottle 6mm diameter flexible plastic tube 1m long Mount cabinet on strong FLAT bench at convenient height Ensure that the WHOLE of the base is supported by the bench Large gas cylinder contai...

Страница 7: ...socket Place the conditioning sachet then the catalyst in the channels under the tray in the order shown Conditioner Catalyst Bung Sleeve assy O ring Port Cover Powder Indicator solution bottle fits h...

Страница 8: ...wing the pump to run for about 2 minutes If the pump is allowed to run continuously the indicator solution tends to evaporate and requires replacing on a regular basis This is not necessary PREPARING...

Страница 9: ...onditioning Sachet should be put in first to the rear of the cabinet 8 Set the humidistat to 70 R H 9 Switch the commissioning switch on the control panel to the ON position by sliding the switch lock...

Страница 10: ...and lift lid as shown e g Gas flow required 35 L minute Pressure Gauge Reading shows 0 8 Bar Any adjustment to the gas flow should be made using the flow regulator situated behind the back cover min...

Страница 11: ...imity to the left hand port Take hold of the left hand rigid cuff with the right hand and withdraw the left hand Place the left hand rigid cuff over the bung using the right hand Press the cuff over t...

Страница 12: ...lowing the diagrams shown below The assembly consists of four parts 1 The sleeve 2 The rigid cuff 3 The wrist cuff 4 The O rings The assembly fits together as shown in the following sketches 3 Trim sl...

Страница 13: ...humidistat which is situated inside the unit just behind the transfer lock The humidistat switches the cooling fan on and off automatically as required THE WATER GAS TRAP TUBE The water gas trap tube...

Страница 14: ...oor of the transfer lock push the holder up into the lock and hold in place with the thumb of the left hand while closing the door with the fingers Now remove the top lid and allow three seconds for w...

Страница 15: ...of one year If for any reason the sachet of catalyst gets wet the contents can be dried out by heating to a temperature of 160 C for a period of two hours The sachet of conditioner can if necessary be...

Страница 16: ...S INPUT PIPE SIZE 6 mm DIA INCUBATOR POSITIVE PRESSURE SETTING 6 mm WG INCUBATOR LEAK NOT DETECTED 1 HOUR TEMPERATURE SETTING 36 5 deg C OVER TEMP SETTING OF THERMAL FUSE 98 deg C SPOTLIGHT COMMISSION...

Страница 17: ...200SG MUNRO Burnt Mill Elizabeth Way Harlow Essex CM20 2HU UK 44 45 United Kingdom Incubator for the environmentally controlled incubation of anaerobic bacteria I certify that the apparatus identified...

Отзывы: