17
F
INSTALLATION AND ASSEMBLY
WARNING
Refer to “
F.1
Introduction
To ensure correct operation of the appliance and maintain safe
conditions during use, carefully follow the instructions given
below in this section.
CAUTION
Before moving the appliance make sure
the load bearing capacity of the lifting
equipment used is suitable for its weight.
WARNING
The appliance is marked with the
induction generator frequency or
frequency range in kHz.
WARNING
The appliance generates mag-
netic fields; frequency range: 10-
100 kHz.
F.2
Customer's responsibilities
The tasks and works required of the Customer are:
• prearrange a high-sensitivity manual-reset magneto-ther-
mal circuit-breaker;
• prearrange a device lockable in the open position for the
connection to the power supply.
• check the floor planarity on which the machine is placed.
• install a rapid gas shutoff valve ahead of each individual
appliance (depending on the model). Install the valve in an
easily accessed place.
• for information regarding the electrical connection, refer to
paragraph;
F.3
Disposal of packing
The packing must be disposed of in compliance with the
current regulations in the country where the appliance is used.
All the packing materials are environmentally friendly.
They can be safely kept, recycled or burned in an appropriate
waste incineration plant. Recyclable plastic parts are marked
as follows:
Polyethylene
• Outer wrapping
• Instructions bag
Polypropylene
• Straps
Polystyrene foam
• Corner protectors
The parts in wood and cardboard can be disposed of,
respecting the current regulations in the country where the
machine is used.
F.4
Joining Appliances
1. Undo the 4 fixing screws;
2. Remove the control panels of the appliances (Fig.1A);
3. Remove the fixing screw nearest the control panel, from
each side to be joined (Fig.1B);
4. Bring the appliances together;
5. Turn the feet to level them until the tops match (Fig.1D);
6. Turn one of the two plates inside the appliances 180
℃
(Fig.1C);
7. From inside the control panel of the same appliance, join
them at the front side, screwing one M5x40 Hex Head
screw (supplied) on the opposite insert (Fig.1E);
8. From the rear of the appliances, insert the coupling plate
(provided) in the side slots on the back panels;
9. Secure the plate with two flat head M5 screws provided
(Fig.1F).
F.4.1
Floor fixing
To avoid accidental tipping of built-in half-module appliances
installed separately, fix them to the floor carefully following the
instructions enclosed with the corresponding accessory
(F206136).
F.4.2
Sealing Gaps Between Appliances
Follow the instructions supplied with the optional sealing paste
pack.
1A
180
1B
1C
N7E N9E
N7E N9E
1F
1E
Содержание N7E
Страница 25: ......
Страница 26: ...Electrolux Professional SPA Viale Treviso 15 33170 Pordenone www professional electrolux com ...