30
Installation manual
7 Gas connection
7.1
Fasten the label
Before installing the machine fasten the label “Read the user instructions” on the inside of the door in a suitable place
and at the front panel.
The label must have the correct country code, choose the correct label from the gas kit.
GB, IE
Read the technical
instructions before
installing the appli-
ance.
Read the user
instructions before
lighting the appliance.
This appliance may
only be installed in a
room if the room
meets the appropriate
ventilation require-
ments specified in the
national installation
regulations.
Art. No. ...........
GB, IE
Read the technical
instructions before
installing the appli-
ance.
Read the user
instructions before
lighting the appliance.
This appliance may
only be installed in a
room if the room
meets the appropriate
ventilation require-
ments specified in the
national installation
regulations.
Art. No. ...........
fig.7642
7.2
General
May only be carried out by qualified personnel.
Mount a shut-off valve upstream from the machine.
The factory nozzle pressure setting corresponds to the fuel value given on the data label.
Check that the nozzle pressure and fuel value correspond with the values in the gas tables on the following pages. If
not, contact the supplier.
Bleed the pipe system before connecting the machine.
Note!
After connection all joints must be checked. There must not be any leaks.
Содержание Lagoon TD6-7
Страница 1: ...Installation manual Tumble dryer TD6 7 Lagoon Type N1 Original instructions 438905990 EN 2022 09 09 ...
Страница 2: ......
Страница 4: ......
Страница 44: ...Electrolux Professional AB 341 80 Ljungby Sweden www electroluxprofessional com ...