Страница 1: ......
Страница 2: ...This page intentionally left blank ...
Страница 3: ...val systems or any future forms of duplication for any purpose other than the purchaser s use without the expressed written permission of Electro Industries GaugeTech 2021 Electro Industries GaugeTech Shark is a registered trademark of Electro Industries GaugeTech The distinctive shapes styles and overall appearances of all Shark meters are trademarks of Electro Industries GaugeTech MP200TM is a t...
Страница 4: ...ntinuing immediately following thereafter for a period of four 4 consecutive years that the Product will be free from defects in material and workmanship and except for the foregoing the Product is sold AS IS with all faults This warranty does not apply to defects resulting from unautho rized modification misuse or use of the Product for any use other than electrical power monitoring which is the ...
Страница 5: ...ivities or e the Customer failed to pay Electro the Product s pur chase price pursuant the Terms of Sale published by Electro at https www elec troind com pdf docs electro terms of sale pdf 4 DISCLAIMER OF WARRANTY AND LIMITATIONS OF LIABILTY EXCEPT AS EXPRESSLY GIVEN IN THIS LIMITED WARRANTY SECTION ALL EXPRESS OR IMPLIED CONDITIONS REPRESENTATIONS AND WARRANTIES INCLUDING WITHOUT LIMITATION ANY ...
Страница 6: ...SHALL NOT EXCEED CUSTOMER S PURCHASE PRICE FOR THE PRODUCT PAID BY THE CUSTOMER FOR THE PRODUCT WHICH GAVE RISE TO SUCH CLAIM IRRESPECTIVE OF THE NATURE OF THE CLAIM WHETHER IN CONTRACT TORT WARRANTY OR OTH ERWISE ELECTRO SHALL NOT BE LIABLE FOR AND THE CUSTOMER SHALL INDEM NIFY DEFEND AND HOLD ELECTRO HARMLESS FROM THE FOLLOWING ANY CLAIMS BASED ON ELECTRO S COMPLIANCE WITH END USER S OR CUSTOMER...
Страница 7: ... IS TO BE USED FOR ALARM OR SECONDARY PROTECTION ONLY Statement of Calibration Our instruments are inspected and tested in accordance with specifications published by Electro Industries GaugeTech The accuracy and a calibration of our instruments are traceable to the National Institute of Standards and Technology through equip ment that is calibrated at planned intervals by comparison to certified ...
Страница 8: ... must be followed to prevent serious injury to people Les instructions doivent être respectées pour d éviter de graves blessures aux personnes Our Focus at Electro Industries GaugeTech EIG EIG exclusively delivers integrated energy and power quality monitoring solutions uti lizing AI and deep industry expertise to improve reliability efficiency and sustainabil ity With over 50 years experience in ...
Страница 9: ...Electro Industries GaugeTech EIG vi 1 1 Product Handling 1 1 1 Introduction 1 1 1 2 Safety Precautions 1 2 1 3 Storage 1 3 1 4 Compliance 1 3 2 Installation 2 1 2 1 Installation Step 1 Unpack the MP200TM in Enclosure 2 2 2 2 Installation Step 2 Drill the Wiring Holes 2 3 2 2 1 Removing and Reinstalling the Panel 2 6 2 3 Installation Step 3 Mount the Enclosure 2 8 2 4 Installation Step 4 Install th...
Страница 10: ...tro Industries GaugeTech Powered by Innovation 4 Operation 4 1 4 1 Overview 4 1 4 2 Troubleshooting 4 1 5 Maintenance 5 1 6 Ordering Information 6 1 A Removing a Meter from Service A 1 A 1 Removing the Meter A 1 A 2 Reinstalling the Meter A 6 ...
Страница 11: ...0TM in Enclosure lets you expand your switchgear capability and or easily meter circuits without expensive and time consuming redesign Simply mount the enclosure in any convenient location next to your switchgear or on a wall and you are ready to go with no downtime This is an ideal solution for a retrofit when there is no metering compartment avail able The unit comes standard with a NEMA 1 rated...
Страница 12: ...ures graves suivre l installation adéquate le fonctionnement et les procédures de maintenance pour éviter ces tensions Completely read and understand the material presented in this document before attempting installation operation or application of the equipment In addition only qualified persons should be permitted to perform any work associated with the equipment Any wiring instructions presente...
Страница 13: ...f the equipment is to be stored indoors for any period of time it should be stored with its protective packaging in place Refer to the MP200TM Metering System Installation and Operation manual on the enclosed CD for the meter s storage requirements The temperature rating for enclosure storage is 20 to 60 oC 4 to 140 oF 1 4 Compliance UL cUL Listed UL508A File number E358101 ...
Страница 14: ...Doc E180701 1 4 1 Introduction Electro Industries GaugeTech Powered by Innovation This page intentionally left blank ...
Страница 15: ...ng hazards in the immediate mounting area that could create a problem Also make sure you have enough clearance around the enclosure to run wiring to it safely EIG recommends at least 2 feet of clearance around the enclosure See Section 2 1 for enclosure dimen sions Carefully remove all packing material from the unit Even though an equipment inspection was made when the equipment was received make ...
Страница 16: ...n the image below A MP200 current inputs 24 of them B CT shorting blocks eight of them C CT connections D Voltage inputs and six fuses E Earth ground on inside of enclosure F Ground wire on enclosure door G Cable assembly H Display cables I LCD display J If ordered optional Add on Protocol ProtoCom ProtoCom Lon Figure 2 1 MP200TM in Enclosure as Shipped J F E H G I D C A B ...
Страница 17: ...allowable location Figure 2 2 Location for Punch Entries The drawings show the area in the bottom of the enclosure where wiring holes can be cut 1 25 40mm from the front of the enclosure 1 5 38 10mm from the right side of the enclosure 1 5 38 10mm from the back of the enclosure and 3 75 95 25mm from the left side of the enclosure 3 75in 95 25mm 1 00in 25 40mm 1 50in 38 10mm 1 50in 38 10mm BOTTOM V...
Страница 18: ...e hole cutting process will not damage any of the wiring or components installed inside or on the enclosure a The two recommended procedures for cutting the wire entry holes are as follows Use a C frame punch to cut the wire entry holes This type of punch does not require a pilot hole A typical C frame punch is shown below Figure 2 3 C Frame Punch Regular punch 1 Place a magnet inside the enclosur...
Страница 19: ... to clean the inside of the enclosure Do not use compressed air or pressurized gas to clean the inside of the enclosure as this may force cuttings into areas that cannot be seen creating a hazard ous condition IMPORTANT All wire entry into the enclosure shall be accomplished with the use of recognized fittings or strain reliefs Bare holes shall not be used NOTE The panel can be removed to facilita...
Страница 20: ...unit remove all connections from the ProtoCom ProtoCom Lon I 2 Remove all connections from the LCD display L 3 Disconnect the green ground wires from the door E 4 Open the cable clamps on the door J and remove the cable assembly F 5 Remove the green ground wires on the lower left side of the enclosure D 6 Remove the four nuts one in each corner of the panel K 7 Carefully remove the panel from the ...
Страница 21: ...ct the green ground wires to the ground stud on the bottom left of the enclosure D 3 Insert the cable assembly F into the cable clamps on the door J 4 Connect the two green ground wires to the stud on the door E 5 Attach the connections to the LCD display L 6 If the MP200TM in enclosure is equipped with a ProtoCom ProtoCom Lon attach all connections to it I Continue to Section 2 3 to mount the enc...
Страница 22: ...nclosure 1 Determine the enclosure mounting location where there are no obstacles and the exterior wiring can be easily accomplished Install as per the NEC or local code requirements Refer to the following diagrams for the enclosure dimensions Figure 2 5 Enclosure Front Dimensions 516 19 mm 20 32 in 517 91 mm 20 39 in ...
Страница 23: ...Doc E180701 2 9 2 Installation Electro Industries GaugeTech Powered by Innovation Figure 2 6 Enclosure Side Dimensions 508 00 mm 20 00 in 166 31 mm 6 54 in 185 67 mm 7 31 in ...
Страница 24: ...Doc E180701 2 10 2 Installation Electro Industries GaugeTech Powered by Innovation Figure 2 7 Enclosure Top Dimensions 508 00 mm 20 00 in ...
Страница 25: ... surface supporting the enclosure 4 Put two fasteners screws or bolts in the top two mounting locations the fasteners shall have a head diameter of no greater than 0 65 and a maximum body diameter of 0 25 5 Install upper mounting screws leave a 3 8 gap between the screw head and the mounting surface 6 Lift the enclosure and hang it from the top two bolts PP LQ PP LQ P P L Q P P L Q PP LQ PP LQ PP ...
Страница 26: ...shim between the mounting surface and the enclosure to compensate for any irregularities 9 Tighten the lower two fasteners Figure 2 9 Location of Mounting Screws 10 Fold back the CT wiring labels in the upper right and left corners of the enclosure see figure above and tighten the upper two mounting fasteners Bend up label to get acces to mounting screws Bottom mounting screws ...
Страница 27: ...1 Display 2 Rear Module 3 Power Supply NOT NEEDED FOR ENCLOSURE see IMPORTANT below 4 RS485 Serial Cable 10 feet NOT NEEDED FOR ENCLOSURE see IMPORTANT below Mounting Hardware 5 anti rotation tee 6 socket wrench 7 installation nut attached to the back of the display IMPORTANT The power supply and cable are included in the box but are NOT NEEDED for the display in the enclosure They would ONLY be n...
Страница 28: ...isplay in the enclosure front cover 1 There are 5 parts to the display as installed in the MP200TM in enclosure Figure 2 11 Display Components for Mounting in Enclosure Display module and touch screen 1 Panel with cutout 8 Display installation nut 7 Anti rotation Tee 5 Rear module containing the electronics to run the display 2 5 1 8 7 2 ...
Страница 29: ...ert the display module with the anti rotation Tee attached into the cutout aligning the anti rotation tee so that it passes through the small hole in the panel 10 4 Place the display installation nut on the portion of the display passing through the panel and finger tighten it 5 Using the socket wrench supplied 6 tighten the display installation nut 7 with a torque between 1 2 and 1 Nm 10 6 to 17 ...
Страница 30: ...le to the Display Module 6 Carefully insert the rear module 2 with the yellow button to the top of the enclosure and push the rear module until it locks into place When it is in place you will hear a click 7 Connect the cable to the rear module see Figure 2 1 Insert and push Free Locked Top of panel Yellow button 2 2 1 ...
Страница 31: ... so it cannot be opened or tampered with A key lock is provided along with two keys Figure 2 14 Location of Enclosure Lock 1 Lock the enclosure by putting the key in the lock and turning it clockwise 2 Remove the key and store it in a safe place When you want to open the enclosure put the key in the lock and turn it counter clockwise Repeat step 1 to re lock the enclosure Enclosure Lock ...
Страница 32: ...Doc E180701 2 18 2 Installation Electro Industries GaugeTech Powered by Innovation This page intentionally left blank ...
Страница 33: ...ure models are pre wired and programmed for either three phase or single phase operation NOTE The current inputs are only to be connected to external current transformers provided by the installer The CT s shall be Listed to ANSI IEEE C57 13 and rated for the current of the meter used A DISCONNECTING MEANS AND UPSTREAM PROTECTION SHOULD BE INSTALLED FOR ALL CIRCUITS A SHORT CIRCUITING TYPE TERMINA...
Страница 34: ...GaugeTech Powered by Innovation 3 1 Wiring Instructions WARNING First connect Earth Ground as shown in the figure below AVERTISSEMENT Branchez d abord la mise à la terre comme indiqué dans le dessin ci dessous Figure 3 1 Earth Ground Connection Earth Ground ...
Страница 35: ...figures WARNING CONTROL WIRING MAY HAVE VOLTAGE PRESENT THAT CAN CAUSE SEVERE PERSONAL INJURY OR DEATH DE ENERGIZE ALL CONDUCTORS BEFORE BEGINNING TO PERFORM ANY WIRING ACTIVITY TO OR WITHIN THE MP200TM IN ENCLOSURE AVETISSEMENT LE CÂBLAGE DES COMMANDES PEUT AVOIR UNE TENSION PRÉSENTE QUI PEUT PROVOQUER DES BLESSURES GRAVES POU LA MORT METTRE HORS TENSION TOUS LES CONDUCTEURS AVANT DE COMMENCER LA...
Страница 36: ...hase Wiring Diagram 855 17 855 17 2 855 17 855 17 2 855 17 855 17 2 7 7 7 72 03 92 7 32 5 13876 4 4 7 7 7 7 9 9 9 1 1 7 6 257 1 2 21 21 3 6 5 8 7 6 6 2 1 83 7 7 25 7 21 5 8 76 2 72 03 855 17 13876 9 9 9 9 57 5281 XVHV LQFOXGHG 4XDQWLW RI PP PP 9 P IDW EORZ 7 4XDQWLW RI PP PP 9 WLPH GHOD 4 3RZHU 6XSSO 3RZHU 6XSSO 1 ...
Страница 37: ...ase 2 Wire Wiring Diagram 855 17 855 17 2 855 17 855 17 2 855 17 855 17 2 7 7 7 72 03 92 7 32 5 13876 XVHV LQFOXGHG 4XDQWLW RI PP PP 9 P IDW EORZ 7 4XDQWLW RI PP PP 9 WLPH GHOD 4 9 1 1 7 6 257 1 2 21 21 3 6 5 8 7 6 6 2 1 83 7 7 25 7 21 5 8 76 2 72 03 855 17 13876 3RZHU 6XSSO 9 9 9 9 57 5281 3RZHU 6XSSO 1 7 4 4 7 7 7 ...
Страница 38: ... 17 855 17 2 7 72 03 92 7 32 5 13876 XVHV QHHGHG 4XDQWLW RI PP PP 9 P IDW EORZ 7 4XDQWLW RI PP PP 9 WLPH GHOD 4 7 7 7 7 4 4 9 1 1 7 6 257 1 2 21 21 3 6 5 8 7 6 6 2 1 83 7 7 25 7 21 5 8 76 2 72 03 855 17 13876 9 9 9 9 57 5281 9 5XQ OLQHV 9 DQG 9 WKURXJK WKH 7 LQ RSSRVLWH GLUHFWLRQV 6HW 37 UDWLRQ WR KDOI LQ WKH PHWHU 9 9 3RZHU 6XSSO 3RZHU 6XSSO 1 ...
Страница 39: ...nsformer circuit and are equipped with captive shorting screws see instructions in Section 5 1 The temperature rating for enclosure operation is 0 to 50 o C 32 to 122 o F Refer to the MP200TM Metering System Installation and Operation Manual for specific operating instructions for the system in your enclosure 4 2 Troubleshooting Symptom Extremely inaccurate readings of voltage and or harmonics Per...
Страница 40: ...Doc E180701 4 2 4 Operation Electro Industries GaugeTech Powered by Innovation This page intentionally left blank ...
Страница 41: ...e operation and inspection you should perform maintenance checks on a regularly scheduled basis Visually inspect for loose parts wires and or hardware inspect for discoloration of insulation and damaged or discolored compo nents be alert for accumulation of dirt and or moisture on structure check operation of disconnecting means and continuity of fuses where applicable If you ever need to remove t...
Страница 42: ...Doc E180701 5 2 5 Maintenance Electro Industries GaugeTech Powered by Innovation This page intentionally left blank ...
Страница 43: ...0Hz 4 Current Class 10 10 Amp Secondary 2 2 Amp Secondary 5 V Switch Key Pack V1 Transducer V2 Basic Logger V3 Advanced Logger 6 Communication X RS485 Only Modbus WIFI Ethernet and WiFi Modbus 7 Display MDSN 3 5 Touch Screen HMI Display with installation kit MDLN 5 7 Touch Screen HMI Display with installation kit Display Installation Kit includes Display and Rear Module RS485 Serial cable Power Su...
Страница 44: ...ctro Industries GaugeTech Powered by Innovation Example above ENCSMP200 Y 60 10 V2 X MDSN ProtoCom MP200 Y Metering System with 60Hz frequency Current Class 10 V 2 V Switch key RS485 only MDSN 3 5 Touch Screen HMI Display and ProtoCom converter ...
Страница 45: ...ws provided on the shorting block are not installed in the correct locations prior to disconnecting any wires AVERTISSEMENT Si le compteur doit être enlevé du service le côté secondaire du transformateur actuel DOIT être court circuité pour prévenir une condition de haute tension dangereuse d apparaitre dans les câblages secondaires du transformateur actuel La brulure d arc et l endommagement d un...
Страница 46: ...t être vissées jusqu à ce que la vis soit en contact avec la barre interne permettant à la barre de devenir électriquement commune à la bar rette de raccordement et mise à la terre The figure below shows where the screws are located that must be tightened down to short the CTs Figure A 1 CT Shorting Block Location ...
Страница 47: ...r make sure all CT connections are made BEFORE unscrewing the shorting screws See A 2 Reinstalling the Meter on page A 6 AVERTISSEMENT Lorsque vous réinstallez le compteur assurez vous que toutes les con nexions de TC transformateur de courant sont faites AVANT de dévisser les vis de court circuit Voir la section A 2 TURN SCREWS CLOCKWISE TO SHORT THE CT ...
Страница 48: ...0 S in Enclosure Location of Fuses Current Leads Connectors Mounting Screws Mounting screws 4 Current Input 1 3 Current Input 4 6 Current Input 7 9 Current Input 10 12 Ground Connection Power and Voltage Connection Fuse Block Six Fuses Current Input 13 15 Current Input 16 18 Current Input 19 21 Current Input 22 24 ...
Страница 49: ...e meter 7 Remove the four mounting screws securing the MP200TM to the panel 8 Remove the meter 855 17 1387 855 17 1387 855 17 1387 855 17 1387 855 17 1387 855 17 1387 855 17 1387 855 17 1387 03 70 81 7 02817 1 6 5 6 2 7 216 1 211 7 21 32 5 1 92 7 211 7 21 86 2 86 6 Mounting screws 4 Current Input Meter 1 Current Input Meter 2 Current Input Meter 3 Current Input Meter 4 Ground Connection Power and ...
Страница 50: ...e appropriate sockets on the meter 4 Connect the 48 current leads to the meter making sure they are attached in the proper order 5 Install the six fuses in the fuse block in their proper location 6 Unscrew all shorting screws on the CT connection block See the figure below Figure A 5 Un shorting the CTs 7 Verify that no foreign material remains inside the enclosure clean it out if found 8 Energize...