
15-1
TUBING CONNECTIONS
SM LEXDCI 1-E.1 GB
15. TUBING
CONNECTIONS
TUBE (Inch)
TORQUE (Nm)
¼”
⅜”
½”
⅝”
¾”
Flare Nuts
11-13
40-45
60-65
70-75
80-85
Valve Cap
13-20
13-20
18-25
18-25
40-50
Service Port Cap
11-13
11-13
11-13
11-13
11-13
1. Valve
Protection
Cap-end
2. Refrigerant Valve Port (use Allen wrench to open/close)
3. Valve
Protection
Cap
4. Refrigerant
Valve
5. Service
Port
Cap
6. Flare
Nut
7. Unit Back Side
8. Copper
Tube
When the outdoor unit is installed above the indoor unit an oil trap is required every 5m along the suction line
at the lowest point of the riser. Incase the indoor unit is installed above the outdoor, no trap is required.
CONTENTS
Содержание Dci 25
Страница 16: ...4 3 OUTLINE DIMENSIONS SM LEXDCI 1 E 1 GB 4 5 Outdoor Unit DCI 72 Z CONTENTS...
Страница 107: ...14 4 EXPLODED VIEWS AND SPARE PARTS LISTS SM LEXDCI 1 E 1 GB 14 4 Outdoor Unit DCI 25 35 CONTENTS...
Страница 109: ...14 6 EXPLODED VIEWS AND SPARE PARTS LISTS SM LEXDCI 1 E 1 GB 14 6 Indoor Unit LEX 50 60 72 DCI CONTENTS...
Страница 113: ...14 10 EXPLODED VIEWS AND SPARE PARTS LISTS SM LEXDCI 1 E 1 GB 14 10 Outdoor Unit DCI 50 CONTENTS...
Страница 115: ...14 12 EXPLODED VIEWS AND SPARE PARTS LISTS SM LEXDCI 1 E 1 GB 14 12 Outdoor Unit DCI 60 CONTENTS...
Страница 117: ...14 14 EXPLODED VIEWS AND SPARE PARTS LISTS SM LEXDCI 1 E 1 GB 14 14 Outdoor Unit DCI 72 Z CONTENTS...
Страница 120: ...16 1 APPENDIX A SM LEXDCI 1 E 1 GB APPENDIX A INSTALLATION AND OPERATION MANUAL CONTENTS...