Watchdog II Mesh User Manual
P/N 86-0006-00
Rev E 01-2020
Page
26 of 38
Expand the New Units CP Group, and then click on the Serial Number of the unit being deployed.
Once on the Site Page, click on
Configure Site.
Enter the requested information on the web form.
Name
: The name you use for the site. The sites will be displayed in alphanumeric order based on what
is entered here. To see units displayed in geographic order, make sure to assign names that,
when sorted, will display in order (for example: “TP01 – Ridgeview Rd”, “TP02 – Walnut Rd”,
“TP03 – Oak St”. These will be sorted by the initial TPXX designation, and will display in TP
order, regardless of the location name.)
Description
: This is a text box for entering comments, details, directions, etc. that are of use to the
user. It is not used for any other purpose by the system.
Latitude and Longitude
: Enter the coordinates in
decimal degrees
format per the sample format (do
not use degrees:minutes:seconds). Make sure that latitude has an N or S at the end (N for
Northern Hemisphere). Longitude must be entered with three digits ahead of the decimal point
(90.1234 would be entered 090.1234) and an E or W at the end (W for North America).
NOTE:
Latitude and Longitude must be properly entered before the satellite photo map of the site can
be displayed on the Site Page.
Time Zone
: Select the Time Zone of the Site.
CP Group
: Select the CP Group (which presumably has already been set up for your company) to
which this monitoring site is assigned.
CPDM Linkage, Hierarchy, Rectifier ID, and Mile Post:
These are fields for linking data reports from
the WatchdogCP system to your CPDM Pipeline Integrity Compliance software package. This
is typically set up with a conference call between Elecsys Technical Support and your IT
Department.
Click on Save.
Next, you should see a page titled
Configuration Settings
.
1.9 Enter Data Labels and Descriptions
Clink on Data Labels and Descriptions
This screen allows you to change the labels and units that are displayed on the website and on
reports. It is set up for a CP rectifier, though the labels and units can be changed if you are
monitoring a pressure transducer, temperature probe, or other sensor.
NOTE: FOR CP Rectifiers, it is important to enter the proper SHUNT FACTOR on this
page!
If you are not using a particular channel, or do not wish it to be displayed on the site page,
select Hide Channel in the respective drop-down box.
If you make any changes, click on Save.
1.10
Setting Important Operational Parameters
From the Site Page, click on Configure Unit, and then click on Reprogram Unit