
Page 6 of 9
User Manual
PAT-Clamp-1
Release 1.0
4 Operation modes
Connect the cell cable of your potentiostat or battery tester channel to the banana sockets at the front
of the PAT-Clamp-1. For the different operation modes, see the table below.
Operation mode 1: Cell voltage control (1 vs 2)
PAT-Clamp-1
1
1S
2
2S
R
Potentiostat
WE
WE-Sense
CE
RE
(CE-Sense)
Battery tester
Plus
Plus-Sense
Minus
Minus-Sense
-
Operation mode 2: Half cell voltage control (1 vs R)
PAT-Clamp-1
1
1S
2
2S
R
Potentiostat
WE
WE-Sense
CE
(CE-Sense)
RE
Battery tester
Plus
Plus-Sense
Minus
-
Minus-Sense
Operation mode 3: Half cell voltage control (2 vs R)
PAT-Clamp-1
1
1S
2
2S
R
Potentiostat
CE
(CE-Sense)
WE
WE-Sense
RE
Battery tester
Minus
-
Plus
Plus-Sense
Minus-Sense