background image

All disclosures, notices and warranty conditions are being written on EKWB website.          

 

 

 

 Revision 1.1 Released on 5

th

 of April 2018 

 

EK-Annihilator EX/EP 

series CPU water block installation manual

 

This product is intended for installation only by expert users. Please consult with a qualified technician for installation. Improper installation may result in damage to your equipment. EK Water Blocks assumes no liability 
whatsoever, expressed or implied, for the use of these products, nor their installation. The following instructions are subject to change without notice. Please visit our web site at 

www.ekwb.com

 for updates. Before installation 

of this product please read important notice, disclosure and warranty conditions printed on the back of the box. 
 

Before you start using this product please follow these basic guidelines: 
1.

 

Please carefully read the manual before through before beginning with the installation process! 

2.

 

Please remove your motherboard from the computer to assure safest mounting process in order to prevent any possible damages to your CPU and/or motherboard’s circuit board (PCB).

 

3.

 

The EK-HFB, EK-HDC and EK-ACF type fittings require only a small amount of force to screw them firmly in place as the liquid seal is ensured by the rubber o-ring gaskets. 

4.

 

The use of corrosion inhibiting coolants is always recommended for any liquid cooling system. 

STEP 1:  GENERAL INFORMATION ON PRODUCT COMPATIBILITY 

STEP 2:  TABLE OF CONTENT 

 

 

 

STEP 3: ANNIHILATOR INLET AND OUTLET PORTS 

 

 

Congratulations  on  your  purchase  of  EK-Annihilator  EX/EP  water 

block. This water block is pre-assembled for use with modern Intel

® 

Processors  with  LGA  3647  socket  for  server  and  workstation  type 

motherboards. 

 

STEP 3a: G1/8 ports configuration: 

4 ports G1/8 are available for low profile server cooling solution. You can connect it in four different ways. You can switch between IN-OUT port. Make sure, 

that both G1/4 and G1/8 plugs are in place, tightened firmly. 

 

 

STEP 3b: G1/4 ports configuration: 

2 ports G1/4 are available for normal use of water block for workstations. IN-OUT orientation doesn't matter, you can use any G1/4 port as IN or OUT. Make 
sure, that all G1/8 plugs are in place, tightened firmly.

 

 

Отзывы: