PRODUCT MAINTENANCE
01/2020
-39-
NP_AD500-2250-1_01_2020
necessary.
Reverse the procedure to reassemble.
Turn on the dryer.
Switch on the compressor.
Check for any dryer leaks.
Fig. 14: Replacement of internal filters
21.8. Replacement of cartridges with adsorbent media
In normal operation, the replacement of the cartridges with adsorbent media must be performed at
the defined interval.
First, shut off the compressed air source.
Turn off the dryer after waiting ten seconds.
Vent all pressure from the dryer in accordance
with Chapter 21.1.
Unscrew the 8 screws (1).
Remove the outlet panel (2).
Pull out and replace the cartridges (3) with new
parts.
Check the sealing (4) on the bottom of the outlet
module and replace if necessary.
Reverse the procedure to reassemble.
Turn on the dryer.
Switch on the compressor.
Check for any dryer leaks..
Fig. 15: Replacement of cartridges with adsorbent media
21.9. Replacement of the logic valve ball
First, shut off the compressed air source.
Turn off the dryer after waiting ten seconds.
Vent all pressure from the dryer in
accordance with Chapter 21.1.
Unscrew the 4 screws (1) and remove the
cover (2).
Remove the ball cover (3).
Replace the ball (4).
Check the orifices (5) and clean if
necessary.
Reverse the procedure to reassemble.
Check leaks and operation of the logic
Содержание AD2250
Страница 1: ...AD500 2250 User manual N vod na pou itie...
Страница 2: ......
Страница 4: ...CONTENTS 5 OBSAH 46...
Страница 14: ...PRODUCT DESCRIPTION NP_AD500 2250 1_01_2020 14 01 2020 Valve switching diagram ECONOMY mode...
Страница 16: ...PRODUCT DESCRIPTION NP_AD500 2250 1_01_2020 16 01 2020 Fig 2 Dryer AD1500 Fig 3 Dryer AD2250...
Страница 55: ...POPIS V ROBKU 01 2020 55 NP_AD500 2250 1_01_2020 asov diagram prep nania ventilov re im ECONOMY...
Страница 57: ...POPIS V ROBKU 01 2020 57 NP_AD500 2250 1_01_2020 Obr 2 Su i AD1500 Obr 3 Su i AD2250...
Страница 90: ......
Страница 91: ......