- 19 -
INSTALLATION OF FITTINGS AND TUBING
STEP 1
Screw-in two (2) G1/4 threaded male fittings. Attach the liquid
cooling tubes and connect the water block(s) to the cooling loop.
You can use any opening as an inlet/outlet port.
EK recommends using EK fittings with all EK water blocks.
CAUTION: When using connectors other than EK fittings,
pay special attention to the length of the fittings’ male G1/4”
thread - 5mm is the maximum G1/4” thread length allowed!
STEP 1
TUBING
EK-FITTING
CHECKING FOR CONTACT
If necessary, temporarily remove the water block to check for uniform
surface contact between the block and components. Pay special
attention to the VRM section of the graphics card. Check whether
the water block makes contact with the intended integrated circuit.
Then repeat Steps from the previous section to re-attach the block.
In case you fail to obtain good contact, please check
again or contact our support service at
https://www.ekwb.com/customer-support/.