- 13 -
PREPARING THE WATER BLOCK FOR INSTALLATION
STEP 1
Unscrew four (4) mounting nuts (turn them in an anti-clockwise
direction to unscrew). Remove the Backplate.
STEP 1
MOUNTING SCREW
(4x)
MOUNTING
NUT (4x)
TURN
ANTI-CLOCKWISE
TO UNSCREW
BACKPLATE
For this step you will need:
Allen Key 2.5mm
SCREW M2 x 2.5
I/O LIGHT SCREEN
I/O COVER
I/O Light screen
Screw M2 x 2.5 (4pcs)
STEP 3
Put the I/O Light onto the I/O Cover and tighten it with four (4)
M2 x 2.5 screws.
For the next steps of monoblock installation on the Z690 Hero
monoblock. Please check the installation manual for EK-Quantum
Momentum² ROG Maximus Z690 Hero D-RGB.
STEP 3
For this step, you will need:
Phillips Head Screwdriver