B.3 ESS system planning and cable routing identification.
The following reference diagram outlines internal and system wiring of the ESS, EMS, and meters. Cables supplied with
the system are indicated in the following table.
Reference P/N
Title
Notes
A1
801003424
EMS USB patch cable
Eguana EMS to 485 adapter
A2
801003414
kWh meter patch cable
10 meter, shielded Cat 5, RJ-45 to pigtail
A3
801003516
Ethernet cable
10 meter, shielded Cat 5, RJ-45 to RJ-45
Figure 24: Single line diagram of ESS with CT type energy meters and EMS.
NOTES
1- The EMS panel can be installed in or near the electrical service panel. A maximum distance of 1 meter from the
electrical panel is recommended.
2 – Home energy meter supports 1Ø and 3Ø configurations where applicable. Observe CT direction as shown.
3 – PV energy meter supports 1Ø and 3Ø configurations where applicable. Observe CT direction as shown. It is
recommended that A PV connection with 1Ø output be wired to the same phase as the ESS (as shown).
4 - 3Ø service shown. For 1Ø service, do not populate R,S ph components.
5 – The battery system must be earth bonded to the building ground to meet lightning protection requirements.
*DRED device applies to the Australia market only.
Disclaimer:
Mfr supplied components represented here are limited to the ESS, EMS panel, EMS to ESS signal cables, and energy meter(s) with signal
cables, fuses and CTs for 1Ø or 3Ø service. All other materials and components represented are customer supplied. Electrical code
compliance is the responsibility of the designer and/or electrical permit holder.