background image

 

 

 

 

67020Rev3 

 

  

 
 
 

 

 

 

 

 

 
 

 

 
 

 

 

Enduro 0307™   

Installation & Startup Guide   

 

Содержание Enduro 0307

Страница 1: ...67020Rev3 Enduro 0307 Installation Startup Guide...

Страница 2: ...g inside the battery cabinet and or with battery modules This product is compatible with the LG Chem battery model EM048126P3S7 only CAUTION The battery provided with this system must be charged only...

Страница 3: ...L DATA 10 APPENDIX A ESS CONFIGURATION WITH EASTRON DIRECT CONNECT ENERGY METERS 11 A 1 EMS KIT CONTENTS 11 A 2 OPTIONAL PV METER KIT CONTENTS 12 A 3 ESS SYSTEM PLANNING AND CABLE ROUTING IDENTIFICATI...

Страница 4: ...extinguishers or carbon dioxide extinguishers In case of flooding Stay out of water if any part of the system or wiring is submerged Do not attempt to operate batteries that have been submerged in wat...

Страница 5: ...Risks of Damage This system is compatible with the LG Chem battery model EM048126P3S7 only Do not attempt to connect any other battery to the system Do not connect any other loads directly to the batt...

Страница 6: ...on algorithm to operate This product can supply limited backup power via an on board 10A power outlet 2 2 Glossary 2 3 Special tools hardware In addition to standard tools the following tools and mate...

Страница 7: ...ation regarding direct connect meters or Appendix B for CT connection type meters 3 Installation Site Preparation Before installing the ESS components read all instructions and warnings in this manual...

Страница 8: ...top edge of the mounting bracket 2 Pull the ESS away from the mounting location and remove the mounting bracket 3 Using a level or straight edge for reference position the mounting bracket on the wall...

Страница 9: ...SS frame aligning the brackets as shown right 4 Secure the battery module using the two mounting screws provided 5 2 Power cable connection CAUTION Observe the polarity of the battery power connection...

Страница 10: ...as shown right 2 Terminate the Line N and Protective Earth PE wires at the AC Grid terminal block 6 2 Supported earthing systems This product can be connected to electrical networks with either TT or...

Страница 11: ...ncludes startup surge of motor type loads 2 Extension cords connected to the outlet should not exceed 10 meters in length 3 Do not connect the outlet to permanently wired electrical circuits for examp...

Страница 12: ...ower operation If the battery low SOC shutdown mode is displayed not attempt to resume backup operation Wait for grid power to return All panel lights flashing System is attempting to communicate with...

Страница 13: ...IV OVC III Pollution degree 3 PCS general data Width x Height x Depth 539 mm x 1236 mm x 231 mm Weight including battery 96 kg Protection type IP21 Ambient temperature relative humidity altitude 10 C...

Страница 14: ...ter Direct Connect 6 1 DIN rail ground terminal block 7 1 Power adapter EMS 8 1 3424 EMS USB cable 0 3m 9 1 3414 Energy meter communication cable 2m 10 1 USB to Ethernet adapter 11 2 3516 EMS to ESS c...

Страница 15: ...with direct software integration to the EMS Refer to section A 6 for the installation procedure Figure 14 PV meter kit contents optional for PV inverters without software integration to the EMS Ref Qt...

Страница 16: ...ect meters are rated maximum 100 Amp and configurable for 1 or 3 phase electrical service Three phase shown 3 PV energy meter supports 1 and 3 configurations where applicable It is recommended that A...

Страница 17: ...inate the pigtail end of the 3414 cable to the RS 485 port of the energy meter as shown in the table below Wire color Signal Green White Ground G Blue A Blue White B 7 Connect a 3424 cable from the Ma...

Страница 18: ...inate the 3424 USB cable to the port labelled PV on the top side of the EMS to the USB port of the 485 adapter on the PV kit 3 Connect the RJ 45 end of the 3414 cable to the 485 adapter as shown in fi...

Страница 19: ...Main Electrical Service A 8 Eastron SDM630 Direct Connect 1 phase 3 phase meter to PV Inverter Figure 20 Eastron direct connect meter wiring diagram main electrical service Figure 21 Eastron SDM630 di...

Страница 20: ...meter 6 1 DIN rail ground terminal block 7 3 CTs 3 ph mains metering use only 1 CT for single phase installs 8 1 3414 Energy meter communication cable 2m 9 2 3424 USB Adapter to EMS USB cables 0 3m 1...

Страница 21: ...ect software integration to the EMS Figure 23 PV meter kit contents optional for PV inverters without software integration to the EMS Ref Qty Description 1 1 Din rail 2 2 Din rail end stop 3 1 RS485 a...

Страница 22: ...2 Home energy meter supports 1 and 3 configurations where applicable Observe CT direction as shown 3 PV energy meter supports 1 and 3 configurations where applicable Observe CT direction as shown It i...

Страница 23: ...adapter as shown in figure 25 3 ESS Connect the 3516 cable to the RS 485 port as shown in figure 26 4 Connect the RJ 45 end of the 3414 cable to the 485 adapter as shown in figure 25 5 Terminate the...

Страница 24: ...r below the EMS kit 2 Terminate the 3424 USB cable to the port labelled PV on the top side of the EMS to the USB port of the 485 adapter on the PV kit 3 Connect the RJ 45 end of the 3414 cable to the...

Страница 25: ...at the meter inputs prior to clamping the core onto a hot wire Note Observe the CT direction and wiring polarity for proper operation of the system B 8 Accu Energy Acurev 1310 3 phase meter PV Inverte...

Страница 26: ...er adapter EMS 8 1 3424 EMS USB cable 0 3m 9 1 3414 Energy meter communication cable 2m 10 1 USB to Ethernet adapter 11 2 3516 EMS to ESS communication cable 10m Home internet connection cable 10m 12...

Страница 27: ...ection C 6 for the installation procedure Figure 32 PV meter kit contents optional for PV inverters without software integration to the EMS Ref Qty Description 1 1 Din rail 2 2 Din rail end stop 3 1 R...

Страница 28: ...AC adapter that plugs into an AC outlet 3 The PV energy meter option shown applies to PV inverters that are not supported with software integration to the EMS The PV energy meter supports 1 and 3 conf...

Страница 29: ...Terminate the pigtail end of the 3414 cable to the RS 485 port of the energy meter as shown in the table below Wire color Signal Green White Ground G Blue A Blue White B 13 Connect a 3424 cable from...

Страница 30: ...the 3424 USB cable to the port labelled PV on the top side of the EMS to the USB port of the 485 adapter on the PV kit 3 Connect the RJ 45 end of the 3414 cable to the 485 adapter as shown in figure...

Страница 31: ...phase meter to Main Electrical Service C 8 Eastron SDM630MV CT 1 phase 3 phase meter to PV Inverter Figure 38 Eastron CT type meter wiring diagram main electrical service Figure 39 Eastron CT type met...

Страница 32: ...29 This page intentionally left blank...