1. CHECK INSTALLATION
Please proceed first with the installation steps by:
No.
Name
Description
0
Inverter installed
correctly?
Please make sure that the connection between the Battery-Box and the inverter
and the installation of the inverter have been carried out correctly. If in doubt,
follow the instructions of the inverter manufacturer.
IMPORTANT: Please install the latest software on the inverter.
1
Configuration
SMA: 4 -8 Battery modules
KOSTAL: 4-9 Battery modules
FRONIUS: 5-9 Battery modules
GOODWE: 4-9 Battery modules
INGETEAM: 4-5 Battery modules
2
DC Power Cable
Make sure that + and - are properly connected.
Check the imprint and the board!
3
Communication cables
Please check:
- CAT5 or higher;
- check the cables and replace them if necessary
- remove not necessary jumpers (see step 20)
4
Grounding
Battery-Box connected directly to the ground-bus of the house.
The battery must not be earthed via the inverter! Otherwise, communication
problems are possible. Correct grounding is absolutely necessary!
5
Installation in the Web
Interface
- Installation Config: Number of M Inverter Manufacturer
- Update: install the latest released software (www.eft-systems.de)
6
State of charge (SOC)
When installed for the first time, the battery will show a predefined SOC of 19%.
This does not correspond to the actual SOC and the battery corrects th eSOC at
the first full charge or discharge. The actual SOC of new modules is about 35%.
Therefore, only perform a module extension if the battery system is close to 35%
SOC. For details see the extension manual (www.eft-systems.de/downloads).
7
Connect to the Internet
(recommended)
Connect the battery to the Internet using an Ethernet cable.
8
Checking the correct
operation
The system runs properly if:
- Home shows RUN and Current Alarm shows no entries
- No error messages on the inverter
- Inverter displays voltage and battery charge correctly
- System charges / discharges
9
Web interface:
Error description
If there are any errors in the section Current Alarm, please follow the instructions
on the following pages.
10
IMPORTANT: If you can not complete the commissioning, then turn off the battery via the system switch on
the BCU before you leave the site.
3