Installation
Page 33
4.7.2
Surface mounting
1.
Attach the operating panel securely to
the surface-mount housing with four
suitable screws.
2.
Attach the frame to the operating
panel.
1.
Operating panel
2.
Surface-mount
housing
3.
Screws
4.
Frame
3.
Connect the operating panel to the
data line DL2 supplied.
4.
Securely attach the surface-mount
housing to the mounting surface with a
suitable detachable connection (e.g.
Velcro strip).
5.
Insert the data line plug into the left
socket on the EFOY Pro fuel cell
marked "Remote Control".
INFO:
If the DL2 data line supplied is not
long enough, you can replace it with
a commercially available network
line that is longer or shorter (Cate-
gory 5 patch cable).