
Introduction
VUTEk 3r & 5r Series Maintenance Guide
11
Most efficient maintenance routine:
•
Read each maintenance task fully before starting.
•
Verify that you have all the materials required to complete each maintenance procedure.
•
Perform all maintenance tasks as scheduled in the maintenance log.
•
Perform maintenance activities either before or after printing production shifts.
The
VUTEk 3r & 5r Series Maintenance Log
is at the end of this document.
The Printer Maintenance Log lists the maintenance tasks, as well as the means for tracking the completion of each item.
Print the first side once per week for daily and weekly tasks, and print the second page once per year for less frequent
maintenance. When filling out the Maintenance Log, record the current date and time (if applicable), and write your
initials in the space provided. Please retain copies of the Maintenance Log. Field Engineers will often ask to review your
maintenance records during service visits.
The Printer Beam contains powerful magnets that assist the carriage movement. Persons with implanted medical devices
must take extreme caution to avoid being within or contacting these magnets. Operators and Technicians must take
extreme caution when using tools or other metal objects within 24" (61 cm) of the Printer Beam Magnets.
If an emergency situation involving inks or maintenance fluids arises, contact local emergency services, download any
SDS (Safety Data Sheets) and make them available to emergency service personnel. SDS are available on the Inkjet
Support Site,
https://inkjet.support.efi.com/main.php
under
Documents
>
SDS (Safety Data Sheets)
.
1.7
Performing Maintenance
1.8
Printer Maintenance Log
1.9
Safety Labels - Printer Beam
1.10
Fluid Emergency