MAINTENANCE MANUAL
ALL SERVICING MUST BE PERFORMED ONLY BY QUALIFIED PERSONNEL. DO NOT ATTEMPT TO SERVICE THE
EFAPOWER EV-PC STATION YOURSELF.
DO NOT OPEN THE DOOR WHILE THE EFAPOWER EV-PC STATION IS ENERGIZED.
BY OPENING THE DOOR OF THE EFAPOWER EV-PC STATION YOU RUN THE RISK OF EXPOSURE TO DANGEROUS
VOLTAGES!
IN CASE OF ANY KIND OF DOUBT REGARDING THESE INSTRUCTION, PLEASE CONTACT:
TOUS LES SERVICES DOIVENT ETRE EFFECTUES UNIQUEMENT PAR DU PERSONNEL QUALIFIE. NE PAS TENTER DE REPARER
L’EFAPOWER EV
-PC VOUS-MEME.
EN OUVR
ANT LES PORTES DE L’EFAPOWER EV
-PC VOUS COUREZ LE RISQUE D'EXPOSITION AUX TENSIONS DANGEREUSES!
EN CAS DE DOUTE CONCERNANT CE, CONTACTER:
EFACEC WILL ASSUME NEITHER RESPONSIBILITY NOR LIABILITY DUE TO INCORRECT OPERATION OR
MANIPULATION OF THE EFAPOWER EV-PC STATION.
8.1
PREVENTIVE MAINTENANCE
The EFAPOWER EV-PC should have regular inspections of preventive maintenance. This preventive maintenance
is essential to ensure that EFAPOWER EV-PC lifetime and reliability is maximized. After the commissioning, the
technician will make a registry of maintenance that will be used to keep track of the equipment’s life cycle.
The enclosure should be inspected during maintenance for evidence of damage or deterioration. A soft cloth
moistened with water must be used to remove accumulated dust and dirt on the outside of the unit, to preserve
the integrity of the structure and avoid displacing dust or dirt into any delicate components of the equipment.
Seals and gaskets should be examined and repaired or replaced if required and fasteners tighten should be
verified. The frequency of maintenance of the enclosure should be increased with extreme weather conditions.
The preventive maintenance inspection also involves work inside de EFAPOWER EV-PC where there is presence
of dangerous AC voltage.
It is important to ensure that a complete test is carried out by a qualified technician on a twice-yearly basis.
We advise to carry out the following verifications:
Table 6 - EFAPOWER EV-PC Preventive Maintenance
Operation
Periodicity
Estimated time(min)
Tools
Visual checking of the installation
Including
AC input cables:
Check the
tightening torque of the cable connections.
Each 6 months
10
Standard Tools
Torque wrench
Check
value of
protective earth
Each 6 months
5
Multimeter
Standard Tools
Test RCD / CCID
by pressing the RCD / CCID
test button
Each 6 months
Standard Tools
The
CE marked
EFAPOWER EV-PC when used as a Central Unit, has an internal 12V battery
. In order to ensure
an optimal performance of the EFAPOWER EV-PC and an efficient and continuous protection of the loads, it is
recommended that the battery is
checked every 12 months
.
Rua Eng.º Frederico Ulrich - Apartado 3078
4471-907 MOREIRA MAIA - PORTUGAL
Tel: (+351) 229403241 - Fax: (+351) 229403209
[email protected]
www.electricmobility.efacec.com
2725 Northwoods Parkway, Ste. B
Norcross, Georgia 30071 USA
Tel: (1) 470 395-3648
-
Fax: (1) 770 446 8920
[email protected]
www.electricmobility.efacec.com