![EES BSM 1 Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/ees/bsm-1/bsm-1_manual_2366594035.webp)
Mounting and installation
4 Mounting and installation
1. Unpack all modules of the delivery and check for possible transport damages. Report any
transport damages to the responsible forwarding agent immediately. Please verify the integrity
of the delivery according to the shipping documents.
2. Insert the annunciator into the prepared panel cut-out and fix it with the fasteners at the side of
the device.
3. Connect the in- and outputs of the annunciator.
4.
Connect the fault annunciator to the network / LAN by patch cable RJ45.
5. For a cascaded annunciator system, connect slave devices according to steps 2 and 3 and
connect the cascaded annunciator to each other by means of a patch cable through the CAN-
Bus-interfaces (terminal X7 at the USM and terminals X7/X8 at the BSM).
6. Connect the power supply and activate power supply.
7. Parameterize the fault annunciato
r (refer to section “
8. After switching on, the fault annunciator requires about 30 s for the
system test and initialization, which is completed with alternate green
flashing of the "OK", "S1" and "S2" indicator lamps.
Watchdog
LED „Self-monitoring” is in steady light – the fault annunciator
is operational. If the Watchdog LED is flashing red,
there’s an error (see
section “
The length of the wires of the in- and outputs should not exceed 3 m.
The length of the power supply wires should not exceed 10 m.
Warning!
The devices is only allowed to be installed by qualified personnel (electricians)
with the operating voltage switched off.