1-4
Section 1
— Installing The Editor
Equipment Inspection
Inspect all equipment for damage. Items to specifically check, and damage
to look for, are listed below:
■
All connectors for bent or broken pins
■
Cables for crimped or broken wires
■
Floppy diskettes for any obvious signs of damage
If any damage is found, contact Editware Customer Service at the telephone
number in the front of this manual. If any item is damaged, DO NOT make
any power or signal connections to the unit unless otherwise advised to do
so by Editware Customer Service.
If there are any discrepancies between the Manual Set Inventory sheet and
the manuals received, or between the Packing List and items received,
contact Editware Customer Service at the telephone number at the front of this
manual. If there are no discrepancies and either no damage, or GVG-
advised correction action is made, continue with this manual.
Facility Checklist
The following checklist is a synopsis of information found in the
appropriate Installation Planning Guide. The Planning Guide should be
referred to for detailed site preparation information.
■
If your facility includes an equipment rack, ensure that the rack is
within 50 feet (16 meters) of your work space.
■
Ensure that there are sufficient AC power outlets of the required 3-
prong grounded type and amp rating for the intended equipment.
■
To maintain consistent signal quality throughout your facility, there
should be a minimum of two Distribution Amplifiers (DAs).
■
Depending on the video switcher, you may need Sync, Subcarrier,
and Blanking in addition to Black Burst.
■
Ensure that the work space is at least large enough to accommodate
the following:
The K2, K3, or K5 Keyboard
One or more monitors
Control Panels for any other equipment