3-11
activated and some pre-deployment checks performed prior to deployment of the towfish as a test to
verify that the system is operating properly.
When performing the system activation and test, refer to
for the location and description of the controls and indicators on the 2000 Topside computer. In addition,
should the system not activate properly or the pre-deployment checks fail, refer to the
section for assistance on how to isolate and correct the problem.
3.8.1
Activating the System
To activate the system:
1.
Turn on the LCD monitors.
2.
Turn on the POWER switch on the back panel of the Topside Computer. This switch can be left in
the on position at all times if desired.
3.
Turn on the SYSTEM POWER switch on the front panel.
The SYSTEM POWER indicator should illuminate, and the HDD indicator should flash while the
Windows desktop opens. Then the DISCOVER 2000-C Dual Frequency Side Scan and DISCOVER
Sub Bottom software open to the Main windows as shown in
4.
Turn on the LINE switch on the back panel of the STARMUX III Digital Telemetry Link. This switch
can be left in the on position at all times if desired.
Содержание 2000-CSS
Страница 26: ......
Страница 34: ......
Страница 59: ...Figure 4 5 STARMUX III Wiring Diagram...
Страница 64: ...Figure 4 7 Towfish Block Diagram...
Страница 66: ...Figure 4 8 Armored Cable PMI Grip Unterminated Topside...
Страница 67: ...Figure 4 9 Test Cable...
Страница 68: ......
Страница 100: ......