
Chapter 2
| Installation Overview
Switch Installation Tasks
– 15 –
Switch Installation Tasks
Follow these tasks to install the switch in your network. For full details on each task,
go to the relevant chapter or section by clicking on the link.
Caution:
Before installing your switch, first review all the safety statements and
guidelines in the
Regulatory and Safety Information
document.
Unpack Package and Check Contents
Unpack your switch and check the package contents to be sure you have received
all the items. See
Install the Chassis
The switch is designed to be installed in either a standard 19-inch equipment rack
or simply placed on a suitable desktop or shelf surface. If you will mount your
switch in a rack then plan your rack installation and install the switch chassis in the
rack. Be sure to take into account switch cooling requirements.
Go to the chapter
Figure 3: Installing the Switch in a Rack
Task 1
Task 2
Attach the brackets to the switch,
Use the rack mounting screws supplied
with the rack to secure the switch in the
rack.
1
2
1
2
Содержание ECS3510-26P
Страница 1: ...Installation Guide www edge core com ECS3510 26P 26 Port Layer 2 Gigabit Ethernet Switch ...
Страница 13: ...Chapter 1 Switch Description Key Technical Specifications 13 ...
Страница 24: ...Chapter 3 Switch Chassis Switch Cooling Requirements 24 ...
Страница 28: ...Chapter 4 Power and Grounding How to Connect to AC Power 28 ...