– 1 –
Quick Start Guide
E082021-MR-R01
150200002424A
64-Port GPON vOLT
ASGvOLT64
1.
ASGvOLT64
2.
Rack mounting kit—2 brackets and 24 screws
3.
2 x Power cord
4.
Console cable—RJ-45 to D-Sub
5.
Documentation—
Quick Start Guide
(this document) and
Safety
and Regulatory Information
1.
64 x SFP GPON ports
2.
2 x QSFP28 40G/100G ports
3.
8 x SFP28 10G/25G ports
4.
System LEDs
5.
1 x SFP Management port
6.
1 x 1PPS
7.
1 x RJ45 Management port
8.
1 x RJ45 Console port
9.
1 x USB port
10.
2 x AC PSUs
11.
4 x Fan trays
11
1
10
4
7
8
5
9
2
3
1
6
10
Package Contents
Overview
SFP GPON Port LEDs:
Green (link up and in service), Blue (disable),
Red (fault), Blinking (activity)
QSFP28 Port LEDs:
Green (100G), Blue (40G), Orange (4G), Blinking
(activity)
SFP28 Port LEDs:
Green (25G), Blue (10G), Orange (1G), Blinking
(activity)
UID LED:
Blinking blue
FAN LED:
Off (OK), Red (fault)
Air Filter LED:
Off (OK), Red (change filter)
PSU LEDs:
Green (OK), Red (fault)
Alarm LED:
Green (OK), Blue (minor), Red (major)
State LED:
Green (OK), Blue (initializing), Red (fault)
1PPS LED:
Green (OK)
System LEDs
Port LEDs
1
2
3
4
5
*150200002424A_R01*
www.edge-core.com
2. B2F Airflow
Install back-to-front (B2F) airflow
fan trays (blue handles) and PSUs
(blue release latches).
Fan Tray Replacement
1.
Loosen the fan tray screw.
2.
Remove fan tray from the
chassis.
3.
Install replacement fan with
matching airflow direction.
PSU Replacement
1.
Remove the power cord.
2.
Press the release latch and
remove the PSU.
3.
Install replacement PSU with
matching airflow direction.
1. F2B Airflow
Remove front-to-back (F2B)
airflow fan trays (red handles) and
PSUs (red release latches).
FRU Replacement
Airflow Reversal