background image

 

 

Versatrax 50™ In-Line 

 

Document: UMBU014988.docm  

Revision: A04 

Created by: KJW 

Date: 20 Nov 2019 

IPN: 3080215-A04 

Source Location: C:\ePDM\ISLEng\products\bu-vt50vehicles\manuals\UMBU014988.docm

 

 

Page 7 of 25 

 

User Ma

nual

 

System Power 

Power Requirements  

The Versatrax 50

™ is operated through an 

ICON

™ Portable Controller

.  The ICON Portable Controller 

provides power to the tether and vehicle. 

Power Input:  Refer to the ICON Portable Controller User Manual for specifications.  

 

Generators / Inverters 

If  powering  the  system  f

rom  a  generator  or  inverter,  refer  to  that  unit’s  operating  manual  for 

recommendations on continuous and peak load ratings.  These power sources may apply a reduced output 
rating based on electrical load and environmental temperature.  Remember to include the power needs of 
all other connected devices (external monitors, recording devices, lighting, etc.) when selecting a generator 
or inverter. 

 

Safety  

In  order  to  be  able  to  use  this  product  properly  and  safely,  every  user  must  first  read  these  operating 
instructions and observe the safety instructions contained therein. Take care of these operating instructions 
and keep them in a place where they can be accessed by everyone. Untrained personnel should not handle 
or operate this equipment. 

This system includes some specific devices that have their own User Manuals. Instructions on those 
manuals must be also read before using the system. 

CAUTION:

  Failure to follow these safety instructions may result in injury or 

equipment damage.

 

WARNING:

   

Intense  Optical  Radiation

  - 

The Versatrax 50™ camera lights are 

extremely bright.  Never look directly at the lights.  Use a welding filter (shade #8 or 
higher) if inspecting the LEDs.   

 

WARNING:  Spark Hazard 

- Under no circumstances should this equipment be 

used in a potentially explosive atmosphere. 

Содержание Inuktun Versatrax 50 In-Line

Страница 1: ...2569 Kenworth Road Suite C Nanaimo BC V9T 3M4 CANADA 1 250 729 8080 info eddyfitechnologies com www eddyfitechnologies com INUKTUN VERSATRAX 50 In Line...

Страница 2: ...7 Power Requirements 7 Generators Inverters 7 Safety 7 System Setup 9 Working and Storage Environment 9 ICON Portable Controller Connection 9 Vehicle Tether Connection 9 Mini Reel Setup 9 Vehicle Con...

Страница 3: ...r Up Sequence 19 ICON ICON RPT 19 Maintenance 19 Connector Care 19 Impulse Connector Lubrication and Cleaning 20 Fuse Replacement 20 Scheduled Maintenance and Servicing 20 Daily 20 Weekly 21 Troublesh...

Страница 4: ...ght to change and or amend these specifications at any time without notice Customers will be notified of any changes to their equipment Information in this manual does not necessarily replace specific...

Страница 5: ...three track configurations The VT50 system can also be configured as a Spectrum 45 or Onyx Drop Camera Typical applications include Sewer and storm drains Air ducts Steam headers Tanks and pressure v...

Страница 6: ...ra Pipe Range VT50 50 102mm 2 4in Control System ICON Inuktun Control and Operations Software Vehicle Power Requirements 36 72VDC 30W System Power Requirements see ICON Controller Manual 110 240VAC 5...

Страница 7: ...nnected devices external monitors recording devices lighting etc when selecting a generator or inverter Safety In order to be able to use this product properly and safely every user must first read th...

Страница 8: ...maintaining the vehicle WARNING High Voltage 36 70 VDC Disconnect the power source before servicing the product otherwise damage may result Eddyfi Technologies Inuktun equipment is used in many varie...

Страница 9: ...m storage temperatures are between 20 C to 60 C 4 F to 140 F ICON Portable Controller Connection The ICON Portable Controller supplies power to the tether and vehicle It provides a communication inter...

Страница 10: ...icle Configuration General Vehicle Assembly One Two or Three Tracks The Versatrax 50 ships disassembled for portability Its modular design can easily be configured to operate with one two or three tra...

Страница 11: ...sing another flexible push link Connect the integrated interconnect cable from the front track to the camera 6 Install the appropriate traction wheels and camera skids as discussed in the sections bel...

Страница 12: ...ke new bristles for the guide brushes to adapt to any specific size Brushes may be custom fit using the following procedure 1 Cut nylon line to length as outlined below or as needed for a specific siz...

Страница 13: ...2mm 3 34 inch 85mm IPN 3089278 Onyx Skid Installation An Inuktun Onyx camera is supplied standard with the VT50 In Line system To install the camera onto the vehicle and with reference to the figure b...

Страница 14: ...t cable on the front track 5 Power up the system so the operator can observe the video on the screen 6 Place the Onyx camera into the skid with the face flush with the front of the skid Rotate the cam...

Страница 15: ...tion of the skid in the figure below A groove at the back of the skid captures it onto the camera mounting block while an open slot at the front allows for camera pan motion Drop Camera Configuration...

Страница 16: ...rconnects using standard cable ties as shown below Optional Traction Arm Springs The spring loaded VT50 traction arms have been optimized for a 2in 50mm pipe size If additional traction is required in...

Страница 17: ...Avoid loading the tether whenever possible Always use the Kellems grip strain relief if applicable to your system Regularly inspect the tether for damage Regularly clean the tether Note Protecting th...

Страница 18: ...ectories are set Test video recording Test track control Test camera control Post Operations Check A Post Ops inspection should be carried out after every deployment using the following checklist Insp...

Страница 19: ...ing are conducted through ICON RPT Manuals for these two software packages are included separately Controls for recording and snapshot functions are kept on screen with the camera controls ICON Manual...

Страница 20: ...anual for information regarding fuse replacement Caution Disconnect the power source before servicing or replacing fuses Scheduled Maintenance and Servicing Picotrac crawlers are designed to provide r...

Страница 21: ...ace box and computer Camera connector on vehicle is loose turn power off first before plugging in camera Check monitor input settings Vehicle power is not on Check for problems with other video compon...

Страница 22: ...tors run but the track doesn t turn there is a problem with the gearing or shaft pins Try changing tracks and update serial number configuration ICON will require a restart Reel Problems 1 Tether dist...

Страница 23: ...al number of the system component in question Eddyfi Robotics Inc Canadian Headquarters and Manufacturing Location 2569 Kenworth Road Suite C Nanaimo BC V9T 3M4 CANADA TF 1 877 468 5886 T 1 250 729 80...

Страница 24: ...until the correct paperwork is completed If cross border shipments are not labelled as per the instructions the items may be held by customs and issued additional fees All returned items must be sent...

Страница 25: ...ction to improperly wired AC receptacles 5 Track belts tethers view ports and other components subject to wear through abrasion are warranted to be free from defects in material and workmanship for a...

Отзывы: