background image

TRIFIRE SERIES 

3

High Efficiency

Oil Fired Hot Water Boiler

INSTALLATION, OPERATION & 

MAINTENANCE MANUAL

Models

 

TRB4075

TRB4090

TRB5100

TRB6130

TRB7165

FOR US SALES ONLY

Manufactured by: 

ECR International Inc.   

2201 Dwyer Avenue, Utica, NY 13501 

 Tel. 800 325 5479  

www.ecrinternational.com  

PN 240013278 REV. A [12/31/2020]

Содержание UTICA BOILERS TRB4075

Страница 1: ...iler INSTALLATION OPERATION MAINTENANCE MANUAL Models TRB4075 TRB4090 TRB5100 TRB6130 TRB7165 FOR US SALES ONLY Manufactured by ECR International Inc 2201 Dwyer Avenue Utica NY 13501 Tel 800 325 5479...

Страница 2: ...ly for updates www ecrinternational com Information and specifications outlined in this manual in effect at the time of printing of this manual ECR International reserves the right to discontinue chan...

Страница 3: ...tions Flue Size Inches cm Dimension A Inches cm Dimension B Inches cm Chimney Vent Direct Vent 4 5 13 18 46 6 1 32 19 5 5 13 21 54 8 1 32 19 6 5 13 24 63 1 1 32 19 7 6 15 28 71 3 19 N A DIMENSIONS PN...

Страница 4: ...ILER SYSTEM PIPING 19 10 HYDRONIC PIPING 20 11 FUEL SUPPLY PIPING 33 12 ANTIFREEZE IN THE SYSTEM 34 13 ELECTRICAL CONNECTIONS 35 14 CHIMNEY AND VENTING CONNECTIONS 36 15 FILLING BOILER 39 16 OPERATING...

Страница 5: ...pplemental instruction document included with direct vent venting kit Boiler models are capable of firing 2 fuel oil from 0 75 gph up to 1 65 gph Boilers include Limit 220 F maximum operating control...

Страница 6: ...not related to personal injury CAUTION Laceration burn hazard Metal edges and parts may have sharp edges and or may be hot Use appropriate personal protection equipment to include safety glasses and...

Страница 7: ...nitizing needs can scald and cause permanent injury Children elderly and infirm or physically handicapped persons are more likely to be permanently injured by hot water Never leave them unattended in...

Страница 8: ...air is purged for boiler installations using float type vents air vents should be closed for normal operation If air is heard or noticed by loss of heat purge system and open vents for short period o...

Страница 9: ...seboard cast iron radiators radiant floor etc Difference between Heating Capacity and Net AHRI Rating called piping and pickup allowance establishes reserve for heating volume of water in system and o...

Страница 10: ...e material see Figure 1 and Table 2 Table 2 BOILER CLEARANCES Unit Combustible Clearance Accessibility Cleaning and Servicing Top 12 32 cm 24 61 cm Right Side 2 5 cm 24 61 cm Left Side 2 5 cm 24 61 cm...

Страница 11: ...hut down for extended period of time Figure 2 General Requirements For A Typical Installation RELIEF VALVE CHECK LOCAL CODES FOR MAXIMUM DISTANCE FROM FLOOR OR OTHER ALLOWABLE SAFE POINT OF DISCHARGE...

Страница 12: ...square inch per 4 000 BTU per hour input of all equipment in space Duct cross sectional area shall be same as opening free area C Horizontal Ducts Minimum free area of 1 square inch per 2 000 BTU per...

Страница 13: ...e Mesh Screen Wood Louvers Metal Louvers Btuh Btuh Btuh 3 x 12 144 000 36 000 108 000 8 x 8 256 000 64 000 192 000 8 x 12 384 000 96 000 288 000 8 x 16 512 000 128 000 384 000 Btuh British Thermal Uni...

Страница 14: ...nge pins on door into slotted mounting bracket holes Recommend hinges be on same side as flexible oil line in order to swing door open 6 Inspect Swing door insulation and rope gasket A Inspect fiber r...

Страница 15: ...nt is water tight 11 Install Limit control mounting plug in upper 3 4 NPT port facing front See Figure 7 12 Install Limit control harness assembly Loosen mounting screw on bottom of limit control A Mo...

Страница 16: ...ing and Control Assembly LIMIT CONTROL WITH INTEGRAL LOW WATER CUT OFF THERMAL LWCO WIRE BURNER WIRING RELIEF VALVE BACK OF BOILER NOTICE Do not install valve between boiler and controls manifold or r...

Страница 17: ...wire to grounding lug When installing wiring through hole in Limit use anti abrasion cable clamp Connect black hot wire to L1 of terminal block white N wire to L2 of terminal block 16 Install top pane...

Страница 18: ...e bolt first or tighten either piece of hardware 100 without using alternating tightening method described above 19 Install oil burner Check oil nozzle in burner for size angle and type inspect electr...

Страница 19: ...is necessary per manufacturer s specific instructions 6 When connecting cold water supply to pressure reducing valve make sure clean water supply is available When water supply is from well or pump in...

Страница 20: ...20 Figure 17 Standard Near Boiler Piping Piping Diagram Legend 10 HYDRONIC PIPING PN 240013278 Rev A 12 31 2020...

Страница 21: ...ARM 2P ISOLATED SWITCH X1 X1 ISOLATED SWITCH X2 PRIORITY 120VAC CIRCULATORS X2 L 1 ZONE 2 L N N 2 CT WITH X X PRIORITY ON ZONE 1 FUSE ELECTRONIC DATA PORT T T W 1 R TW PRIORITY ZONE 120 VAC L N PRIORI...

Страница 22: ...3 4 OPTION SWITCHES ZR ZC DPM 2 ZONE VALVE PUMP PRIORITY Z1 Z2 Z3 Z4 T T T T T T T T AZ 4CP 120VAC TO TRANSFORMER 24VAC FROM TRANSFORMER ZONE VALVE ZONE VALVE T STAT T STAT T STAT CONTROL TANK OR THE...

Страница 23: ...4 OPTION SWITCHES ZR ZC DPM 2 ZONE VALVE PUMP PRIORITY Z1 Z2 Z3 Z4 T T T T T T T T AZ 4CP 120VAC TO TRANSFORMER 24VAC FROM TRANSFORMER ZONE VALVE ZONE VALVE ZONE VALVE T STAT T STAT T STAT CONTROL TAN...

Страница 24: ...RIORITY ON X X ZR ZC ZONE 2 Z DATA PORT 120 VAC N 4 L N L N ZONE MODULE TO EXTRA PRIORITY ON ZONE 4 COMMON 1 3 2 4 ZONE 4 ZONE 3 ZONE 2 ZONE PRIORITY THERMOSTATS 24 VAC 1VA ZONE 4 ZONE 3 ZONE 2 PRIORI...

Страница 25: ...Figure 22 Primary Secondary Piping And Wiring With Circulators And Domestic Hot Water MAX 4 X DIAMETER CLOSELY SPACED TEES BOILER PUMP 25 10 HYDRONIC PIPING PN 240013278 Rev A 12 31 2020...

Страница 26: ...ZR L 2 N 1 L N L ZONE 1 PRIORITY ON X X ZR ZC ZONE 2 Z DATA PORT 120 VAC N 4 L N L N ZONE MODULE TO EXTRA PRIORITY ON ZONE 4 COMMON 1 3 2 4 ZONE 4 ZONE 3 ZONE 2 ZONE PRIORITY THERMOSTATS 24 VAC 1VA Z...

Страница 27: ...M TANK PERFORMANCE CONSIDER USING ZONE CIRCULATOR BOILER PUMP MAX 4 X DIAMETER CLOSLEY SPACED TEES CONSULTER LA FIGURE 24 Figure 23 Piping And Wiring Primary Secondary Multi Zone System Piping With Zo...

Страница 28: ...2 3 4 2 1 3 4 OPTION SWITCHES ZR ZC DPM 2 ZONE VALVE PUMP PRIORITY Z1 Z2 Z3 Z4 T T T T T T T T AZ 4CP 120VAC TO TRANSFORMER 24VAC FROM TRANSFORMER ZONE VALVE ZONE VALVE T STAT T STAT T STAT CONTROL TA...

Страница 29: ...0 HYDRONIC PIPING Figure 24 Piping And Wiring Primary Secondary Piping With Zone Valves And Domestic Hot Water With Circulator ZONE VALVE MAX 4 X DIAMETER CLOSELY SPACED TEES PN 240013278 Rev A 12 31...

Страница 30: ...3 ZONE 2 2 4 ZONE 3 1 2 3 4 2 1 3 4 OPTION SWITCHES ZR ZC DPM 2 ZONE VALVE PUMP PRIORITY Z1 Z2 Z3 Z4 T T T T T T T T AZ 4CP 120VAC TO TRANSFORMER 24VAC FROM TRANSFORMER ZONE VALVE ZONE VALVE ZONE VALV...

Страница 31: ...PARATOR ZONE VALVE EXPANSION TANK WATER INLET SYSTEM CIRCULATOR Figure 25 Bypass Piping Fixed Low Temperature Only Adjust two throttling valves to maintain at least 130 F 140 F in boiler return BOILER...

Страница 32: ...VE 4 WAY MIXING VALVE EXPANSION TANK Figure 27 Bypass Piping 4 Way Valve Option with Circulator On Supply Side SHUT OFF VALVES SHUT OFF VALVES BOILER SUPPLY MAIN TO COMBINED HEATING COOLING SYSTEM RET...

Страница 33: ...n into fuel pump making it difficult to maintain oil pressure at nozzle Do not run overhead fuel lines from tank to oil burner Follow instructions attached to fuel pump for fuel pump and by pass conne...

Страница 34: ...or more and increase fuel consumption See Table 6 and 7 Table 6 BOILER WATER VOLUMES Number of Boiler Section Total Volume Gallons 4 3 6 5 4 3 6 5 1 7 5 9 Table 7 PIPING WATER VOLUMES PIPE SIZE COPPER...

Страница 35: ...ith fused disconnect switch in this circuit Never jump out or make inoperative any safety or operating controls WARNING Electrical shock hazard Turn OFF electrical power supply at service panel before...

Страница 36: ...into fireclay tile lined masonry chimney or type L vent or factory built chimney that complies with type HT requirements of UL103 See Figure 32 3 Chimney Inspection Prior to installation of any new o...

Страница 37: ...and total volume of flue gases Operate boiler for at least 5 minutes before measuring draft Minimum Draft at Breech Draft induced by the chimney must create at least a neutral pressure of 0 zero inche...

Страница 38: ...hest part of passage through roof Must be at least 2 FT higher than any neighboring object within 10 Ft Must have unobstructed top opening Must be at least 4 inches thick and be tight Must slope up at...

Страница 39: ...ng E Open purge valve F Open shut off valve in cold water supply piping G When zone is completely purged of air close zone valve or shut off valve Open valve to next zone to be purged Repeat this step...

Страница 40: ...sely if boiler provides adequate heat added fuel savings can be achieved by selecting higher setting example 4 or 5 If heating and indirect water heater signals were not separated when wiring the cont...

Страница 41: ...n a second time for 20 seconds 4 Display will read PURR OFF 16 7 Control Action On System Start Up At initial start up with economy feature active control establishes 145 F target temperature To test...

Страница 42: ...Indicates thermal targeting function is active and limit control will reduce boiler temperature to conserve fuel Economy feature is activated using the Economy dial See How Thermal Targeting Works thi...

Страница 43: ...Fire burn asphyxiation hazard Do not attempt to start burner when oil has accumulated in combustion chamber or unit is full of vapor or hot Check operation of all boiler controls before installation o...

Страница 44: ...eliminary steps I Check wiring connections and power supply II Verify power is on to controls III Verify limit control is closed IV Check contacts between igniter and electrodes V Check piping to oil...

Страница 45: ...e is turned off and control delays turning motor off for set motor off delay time before control returns to standby I Pump Prime Igniter and motor are on with solenoid valve energized for 4 minutes Du...

Страница 46: ...perature Table 12 Thermostat locations to Avoid DEAD SPOTS HOT SPOTS COLD SPOTS Behind doors Concealed pipes Concealed pipes or ducts Fireplace TV sets Stairwell drafts Corners alcoves Radios Door dra...

Страница 47: ...connector tube 2 Recheck Z dimension periodically when servicing to ensure escutcheon plate has not been moved Reset Z dimension if you replace air tube or nozzle line assembly AFG Burner with V1 Hea...

Страница 48: ...KER 3 is aligned with correct index number as per Burner Settings Table B Tighten RETAINING NUT 1 NOTE Zero and four are scale indicators only From left to right first line is 4 and last line 0 On som...

Страница 49: ...1 10 87 0 7165 V1 2 75M 2 625 1 65 V7 Delavan 1 25x45B 175 3 4 10 87 0 Timings Pre purge 15 seconds Post purge 15 seconds Table 13 Beckett Chimney Vent Preliminary Burner Settings Burner settings pro...

Страница 50: ...0 0 85 WC 6130 6 Slot 2 5 1 30 V6 Delavan 1 00x45B 175 2 0 0 65 WC Timings Pre purge 15 seconds Post purge 30 seconds Table 14 Beckett NX Direct Vent Preliminary Burner Settings TABLE14b BECKETT ECR P...

Страница 51: ...tting Air Setting Rated AFUE Efficiency 4075 Reverse 2 75 0 75 Oval Delavan 0 65x60W 150 1 3 6 87 0 4090 Reverse 2 75 0 90 Oval Delavan 0 75x90B 140 2 3 5 86 0 5100 Standard 2 75 1 00 None Delavan 0 7...

Страница 52: ...ing Rate GPH Combus tion Liner Nozzle Mfr Nozzle Type Pump Pressure PSI Head Setting Air Setting Pressure Switch Setpoint 4075 Reverse 2 75 0 75 Oval Delavan 0 65x60W 150 3 5 0 0 25 WC 5100 Standard 2...

Страница 53: ...zle Mfr Nozzle Type Pump Pressure PSI Head Bar Setting Air Band Setting Rated AFUE Efficiency 4075 4 56 0 75 OVAL DELAVAN 0 60x60B 160 1 22 87 0 4090 4 56 0 90 OVAL DELAVAN 0 75x70A 145 2 28 86 0 5100...

Страница 54: ...ring freezing weather Water left in system will freeze and crack pipes and or boiler 18 7 Oil Burner Maintenance Perform following preventative maintenance annually preferably prior to heating season...

Страница 55: ...system including radiation Allow boiler water to reach operating temperature if possible Continue to circulate water for few hours Stop firing boiler Drain system in a manner and to a location that h...

Страница 56: ...3rd pass Two inner flue ways B Inspect chimney and clean if necessary C Clean and re attach vent connector onto rear of the boiler with three screws NOTICE When securing burner swing door verify door...

Страница 57: ...UM HOSE VACUUM HOSE BRISTLE BRUSH FLUE BRUSH FLUE BRUSH FRONT VIEW 3RD PASS COMBUSTION CHAMBER 2ND PASS Figure 46 Cleaning the Boiler 19 OIL BOILER BURNER CLEANING INSTRUCTIONS PN 240013278 Rev A 12 3...

Страница 58: ...ot come on I No power to control II Control is in soft lockout or restricted mode Press reset button for more than 1 second to exit soft lockout If control has recycled three times within same call fo...

Страница 59: ...low water to run and clear valve seat Water logged expansion tank Drain tank follow instructions to provide air buffer HAVE YOUR SERVICE TECHNICIAN CHECK ANY PROBLEM YOU ARE UNABLE TO CORRECT LIMIT CO...

Страница 60: ...ed after expansion tank This configuration allows circulator to pump away from expansion tank for improved air elimination and system performance Air eliminator fitting or air purger is not provided A...

Страница 61: ...US GPM 5 10 15 20 m h 3 Head feet Model Watts Volts Amps Capacitor UP 15 42F 85 115 0 74 10 F 180 V Fourni avec la pompe Figure 47 Grundfos Pump Curve Figure 48 Taco 007e Pump Curve 21 EQUIPMENT AND A...

Страница 62: ...62 NOTES PN 240013278 Rev A 12 31 2020...

Страница 63: ..._________ Installation instructions have been followed Checkout procedure and adjustments performed Maintenance and Service issues reviewed with owner maintenance person Installation booklet affixed o...

Страница 64: ...ll specifications subject to change without notice 2020 ECR International Inc 2201 Dwyer Avenue Utica NY 13501 Tel 800 325 5479 www ecrinternational com BDR THERMEA GROUP PN 240013278 Rev A 12 31 2020...

Отзывы: