9 - START UP PROCEDURE
9.4 Fill Condensate Trap with Water
WARNING
Asphyxiation hazard! Fill condensate trap before
starting boiler to avoid combustion products escaping
boiler. Failure to follow these instructions could result
in death or serious injury.
!
•
To fill the condensate trap pour water into exhaust vent
until water begins to flow through the siphon.
• Visually inspect the siphon to ensure it is full with clean
water.
• During operation check condensate trap to ensure it
draining properly.
Note
Condensate trap must be manually filled with water
at initial start up.
Condensate Drain
•
Boiler is fitted with automatic air vent positioned on pump
Vent and is fitted with adjustable sealing cap. See Figure
9-1.
•
Open central heating flow and return valves. Spindle is flat
in-line with valve.
•
Open fill point valve on filling system until water begins to
flow. To aid venting boiler drain may be open until water
flows out. Close drain as soon as water appears.
• During initial system air purge open valve connected
to top left of heat exchanger. Open four (4) full turns
counterclockwise until steady stream of water is
witnessed. Close fully turning clockwise with no tools
needed. See Figure 9-1.
• Systems using radiators to remove air - Vent each radiator
in turn, starting with lowest in the system.
• It is
IMPORTANT
the pump is properly vented to avoid
running it dry and damaging its bearings. Unscrew and
remove cap from center of pump. Use screwdriver. Rotate
exposed spindle about half turn, replace cap.
• Check operation of heating pressure relief valve. Pull lever
on top of valve upwards lifting the seat. This will allow
water to escape from system. Check water is escaping
from the system.
• Open cold water supply inlet valve. Turn on all hot
water taps. Allow water to flow until no air is present.
Turn off taps. See Physical Data page 4 and section 2.7
Operational Features.
9.3 System Start Up
Follow all codes and regulations when filling the boiler.
Use drain taps to allow system to completely drain.
Thoroughly flush the heating system before boiler is connected
and again after first heating season.
Heat
Exchanger
Manual Air
Vent
Circulator
Air Vent
240013354 REV A [07/01/2021]
Содержание Utica Boilers MAC-115
Страница 2: ...MAC 205...
Страница 4: ...MAH 165...
Страница 77: ...73 APPENDIX A WIRING DIAGRAMS A 2 MODEL 125 Heat Only 240013354 REV A 07 01 2021...
Страница 78: ...74 APPENDIX A WIRING DIAGRAMS A 3 MODEL 165 Heat Only 240013354 REV A 07 01 2021...
Страница 79: ...75 APPENDIX A WIRING DIAGRAMS A 1 MODEL 115 Combi 240013354 REV A 07 01 2021...
Страница 80: ...76 APPENDIX A WIRING DIAGRAMS A 4 MODEL 150 Combi 240013354 REV A 07 01 2021...
Страница 81: ...77 APPENDIX A WIRING DIAGRAMS A 5 MODEL 205 Combi 240013354 REV A 07 01 2021...
Страница 115: ...32 CIRCULATOR CONNECTIONS WIRING DIAGRAM Single Zone Circulator Wiring Using ARGO AR822 II PN 240011430 REV O 07 01 2021...
Страница 117: ...34 MODEL 125 Heat Only 125 HEAT ONLY WIRING DIAGRAM PN 240011430 REV O 07 01 2021...
Страница 118: ...35 MODEL 165 Heat Only 165 HEAT ONLY WIRING DIAGRAM PN 240011430 REV O 07 01 2021...
Страница 119: ...36 115 COMBI WIRING DIAGRAM MODEL 115 Combi PN 240011430 REV O 07 01 2021...
Страница 120: ...37 MODEL 150 Combi 150 COMBI WIRING DIAGRAM PN 240011430 REV O 07 01 2021...
Страница 121: ...38 MODEL 205 Combi 205 COMBI WIRING DIAGRAM PN 240011430 REV O 07 01 2021...
Страница 126: ...43 Low Water Cutoff Detail LOW WATER CUTOFF NO NO YES PN 240011430 REV O 07 01 2021...
Страница 131: ...48 3 FAULT SOLUTION SECTIONS PN 240011430 REV O 07 01 2021...
Страница 134: ...51 Parameter ID Changed From Changed To Date Reason PARAMETER CHANGE HISTORY PN 240011430 REV O 07 01 2021...