![ECR International Green Mountain GMCB150 Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/ecr-international/green-mountain-gmcb150/green-mountain-gmcb150_installation-operation-and-maintenance-manual_2356143043.webp)
43
8 - ELECTRICAL CONNECTIONS
8.3 Access To Connection Block
1.
Ensure there is no line voltage (electrical power) at boiler.
2.
Unscrew two screws located under front panel. Remove
front cover.
3.
Guide controller or thermostat wire through round rubber
grommet(s) on left side of boiler's bottom plate right.
4.
Tilt control box forward by opening the holding clip located
on left side of boiler.
5.
Expose M1 and M2 terminal blocks by removing the two
(2) screws from plastic cover on left. See Figure 8-3.
6.
Remove plastic from channel in plastic cover. Run the
wires through the new opening.
7.
Connect the wires to appropriate terminals on connection
block.
8.
Tilt control box back to original position. Ensure clip on
left side is fully engaged.
9.
Replace front cover and screws under front panel.
10.
Turn power to boiler on.
Various thermostats and controllers can be connected to
standard control PCB.
8.4 Main Supply Connection
Main supply is connected to terminal block
M1
which is high
voltage (120V / 60Hz).
Fuses, 3.15 A, are incorporated in the power supply terminal
block. To check or replace fuse pull out black fuse carrier.
TERMINAL BLOCK M1
(L) = Live (brown)
(N) = Neutral (light blue).
= Ground (yellow-green).
TERMINAL BLOCK M2
Terminals 1 - 2:
Not used
Terminals 4 - 5:
outdoor temperature sensor connection
(supplied as accessory)
Terminal 3 :
Not Used
Terminals 6 - 7 - 8:
see section 8.5 for 24V T-Stat.
Terminals 9 - 10:
Indirect storage tank sensor connection
for GMHB125 & GMHB160 models.
FIGURE 8-2 TERMINAL BLOCK LOCATIONS
Fuse Holders (2)
DANGER
Electrocution Hazard! HIGH VOLTAGE - Connections
in terminal block M1 are high voltage (120V / 60Hz).
Before making connections, verify appliance is
disconnected from power supply. Respect the input
polarity on terminal block M1: L (LINE) - N (NEUTRAL).
Failure to follow these instructions WILL result in death
or serious injury.
!
FIGURE 8-3 TERMINAL PLASTIC COVER WITH
KNOCKOUTS
Remove
New Opening
PN 240012363 REV. A [08/31/2018]
Содержание Green Mountain GMCB150
Страница 51: ...51 8 ELECTRICAL CONNECTIONS FIGURE 8 13A WIRE DIAGRAM GMCB150 COMBI BOILER PN 240012363 REV A 08 31 2018 ...
Страница 52: ...52 FIGURE 8 13B 8 ELECTRICAL CONNECTIONS LADDER DIAGRAM GMCB150 COMBI BOILER PN 240012363 REV A 08 31 2018 ...
Страница 55: ...55 8 ELECTRICAL CONNECTIONS FIGURE 8 15A WIRE DIAGRAM GMCB200 COMBI BOILER PN 240012363 REV A 08 31 2018 ...
Страница 56: ...56 8 ELECTRICAL CONNECTIONS FIGURE 8 15B LADDER DIAGRAM GMCB150 COMBI BOILER PN 240012363 REV A 08 31 2018 ...