![ECR International Green Mountain GMCB150 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/ecr-international/green-mountain-gmcb150/green-mountain-gmcb150_installation-operation-and-maintenance-manual_2356143013.webp)
13
4 - LOCATING BOILER
D
13.58 in /
345.00 mm
B
A
30 in
[763 mm]
125 & 150
13-9/16 in
[345 mm]
4.2 Service and Combustible Clearances
160 & 200
21-1/2 in
[571.5 mm]
CLEARANCES REQUIRED FOR
CLOSET INSTALLATION
CLEARANCES FOR
COMBUSTIBLES
Top View
Back
Closet Installation
0 in /0 mm between Back of Unit and wall
Left Side View
of Boiler
Front View of Boiler
Front View of Boiler
C
F
B
C
B
C
D
D
D
SERVICE CLEARANCES
CLEARANCES FOR COMBUSTIBLE MATERIALS
F
A
PN 240012363 REV. A [08/31/2018]
Содержание Green Mountain GMCB150
Страница 51: ...51 8 ELECTRICAL CONNECTIONS FIGURE 8 13A WIRE DIAGRAM GMCB150 COMBI BOILER PN 240012363 REV A 08 31 2018 ...
Страница 52: ...52 FIGURE 8 13B 8 ELECTRICAL CONNECTIONS LADDER DIAGRAM GMCB150 COMBI BOILER PN 240012363 REV A 08 31 2018 ...
Страница 55: ...55 8 ELECTRICAL CONNECTIONS FIGURE 8 15A WIRE DIAGRAM GMCB200 COMBI BOILER PN 240012363 REV A 08 31 2018 ...
Страница 56: ...56 8 ELECTRICAL CONNECTIONS FIGURE 8 15B LADDER DIAGRAM GMCB150 COMBI BOILER PN 240012363 REV A 08 31 2018 ...